Blaine logo
File #: RES 21-056    Version: Name: Plat - Blaine 35 (21-0004)
Type: Resolution Status: Passed
File created: 4/5/2021 In control: City Council
On agenda: 4/5/2021 Final action: 4/5/2021
Title: Granting a Preliminary Plat to Subdivide Approximately 28.8 Acres into Three Lots to be Known as Blaine 35 Business Park at 85th Avenue NE (County Road J) and I-35W Service Drive. Artis REIT (Case File No. 21-0004/EES)
Sponsors: Lori Johnson
Attachments: 1. Attachments, 2. Draft PC Minutes

Development Business - Lori Johnson, City Planner

 

Title

Granting a Preliminary Plat to Subdivide Approximately 28.8 Acres into Three Lots to be Known as Blaine 35 Business Park at 85th Avenue NE (County Road J) and I-35W Service Drive. Artis REIT (Case File No. 21-0004/EES)

 

Executive Summary

The applicant is proposing three high-finish light industrial buildings totaling 317,400 square feet. The preliminary plat is consistent with the subdivision standards and the conditional use permit applies conditions typical to industrial development in the PBD.

 

Schedule of Actions

Planning Commission Public Hearing

03/09/21

City Council (Preliminary Plat)

04/05/21

City Council (Final Plat)

TBD

Action Deadline

05/29/21

 

Background

Staff report prepared by Elizabeth Showalter, Community Development Specialist

 

Artis REIT is proposing the development of a vacant property located at the northwest corner of 85th Avenue (County Road J) and 35W service road, which is zoned PBD-Planned Business District. The applicant is proposing three large, high finish industrial buildings with a total square footage of 317,400 square feet.

 

A plat is proposed to create three lots, one for each building. Because the property is zoned PBD, all uses require a conditional use permit. The applicant is also pursuing a conditional use permit for a special purpose fence to allow the construction of an 8-foot fence on the western edge of the project.

 

The City Council, acting as the EDA, has directed staff to establish a TIF district to provide financial assistance to this project and has agreed to sell wetland credits at a 50% discount to the developer.

 

Preliminary Plat

The proposed preliminary plat creates three lots, one for each building and dedicates right of way for 35W Service Road, which is currently located within an easement on the property. Park dedication for the platted lots becomes due at final plat approval, based on the industrial rate in effect at the time of development for the 24.49 total acres of upland within the plat. If final platted in 2021, the industrial rate of $6,702 per acre will result in a total park dedication payment of $164,132.

 

A RCWD permit is required for the proposed development.

 

The developer will be responsible for development custom grading, installation of additional required sanitary sewer and services, water main extension and services, storm drainage improvements, storm water quality treatment, mailboxes, and all appurtenant items.

 

Construction sites grading one acre or more requires a National Pollutant Discharge Elimination System (NPDES) Phase II Construction Activity Permit from the Minnesota Pollution Control Agency (MPCA) prior to construction. In order to obtain the permit, the developer is required to include temporary and permanent erosion protection and sediment control Best Management Practices (BMPs), and a Storm Water Pollution Prevention Plan (SWPPP) information on the development grading plan. A building permit will not be issued until a copy of the permit application and SWPPP are submitted to the City.

 

Conditional Use Permit

All uses/sites in the PBD (Planned Business District) require a conditional use permit. Artis REIT is proposing to construct three light industrial/office buildings with 118,500, 98,900, and 100,000 square feet. The buildings do not have identified tenants, however, the approved land uses will include office, office/showroom, light manufacturing and warehouse. Any warehouse use requires a minimum of 25% of the square footage be used for office or manufacturing. Outside storage is not permitted in the PBD zoning district. Building C may be constructed as a build-to-suit project.

 

The City has used a parking calculation utilizing a mix of the office, warehouse, and manufacturing parking ratio for general light industrial buildings for many years. This calculation results in a total of 784 stalls required for the project. The applicant is proposing a total of 718 stalls with proof of parking stalls resulting in 961 total stalls, exceeding the required parking. The potential user for Building C anticipates a need for additional parking as the company grows and 106 additional stalls are shown which will be constructed if needed. A separate conditional use permit will not be required for this expansion, but site plan approval will be required at that time.

 

All setbacks are met with both the building and parking areas. The parking lots for Building B and C are proposed to connect trucks serving Building C accessing the dock through Lot B. A cross access agreement will be required for the shared access.

 

Based on the proposed building floor area, the following landscaping must be provided and adjusted to reduce the required quantities in exchange for oversizing trees:

 

                     Ornamental Trees (2”): 159

                     Conifer Trees (8’): 80

                     Overstory Trees (2.5”): 53

                     Overstory Trees (3”): 53

 

The landscape plan provided meets these requirements. To provide buffering to the adjacent residential properties, a combination of trees and an 8-foot board on board fence is shown on the western edge of the project, with the trees located on the residential side of the fence. The requirement of the 8-foot fence is consistent with previous industrial projects adjacent to residential properties.

 

Overhead doors are limited to 1 per 6000 square feet of floor area in the PBD district. The submitted plans meet the requirement and depict knock out panels to allow for future doors, if needed. Staff will review building permits to ensure that overhead doors do not exceed 20 for Building A, 16 for Building B, and 17 for Building C.

 

Site plan approval is required for the site, including submission of a site improvement performance agreement and associated financial guarantee.

 

The developer shall address comments from MnDOT and Anoka County. See the attached letter from MnDOT.

 

The buildings are shown with a combination of prefinished exposed aggregate concrete panels, glass, and metal accents. An accent color must be provided on all four sides of the building to meet the architectural design requirements in the PBD.

 

Strategic Plan Relationship

Not applicable.

 

Board/Commission Review

The Planning Commission voted unanimously to approve the preliminary plat. Two neighboring property owners that spoke at the public hearing were concerned about the buffering on the west side of the site and wanted a berm between their homes and the project. The placement of the trees between the fence and their property alleviated some of their concern.

 

Financial Impact

The zoning approvals do not have a financial impact. The EDA approved financial assistance through the establishment of a new economic development TIF District and the sale of wetland credits at a 50% discount.

 

Public Outreach/Input

A public hearing notice for the Planning Commission meeting was sent to property owners within 350 feet of the property boundaries.

 

A neighborhood meeting was held virtually on February 25, 2021 in accordance with the Neighborhood Meeting Policy. No members of the public attended the meeting. A copy of the notice mailed to property owners is attached.

 

Staff Recommendation

By motion, approve the Resolution.

 

Attachment List

Zoning and Location Map

Applicant’s Narrative

Color Site Plan

Preliminary Plat

Site Plan

Proof of Parking Plan

Wetland Mitigation

Grading Plan

Utility Plan

Storm Sewer Plan

Landscape Plan

Architectural Plan

Building Rendering

MnDOT Review

Neighborhood Meeting Invitation

Draft Planning Commission Meeting Minutes 3/9/21

 

Body

                     WHEREAS, an application has been filed by Artis REIT as subdivision Case File No. 21-0004; and

 

                     WHEREAS, said case involves the division of land described as follows:

 

That part of the South Half of the Southeast Quarter of Section 34, Township 31 North, Range 23 West, Anoka County, Minnesota, lying westerly and northwesterly of a line run parallel with and distant 60 feet northwesterly of the following described line:

 

Beginning at a point on the North line of Section 5, Township 30 North, Range 23 West, distant 523.15 feet West of the Northeast corner thereof; thence run northerly at an angle of 89 degrees 40 minutes with said North Section line (measured from west to north) for 466.4 feet: thence deflect to the right on

a 6 degree 00 minute curve (delta angle 27 degrees 04 minutes 06 seconds) for 451.14 feet; thence on tangent to said curve for 380.9 feet; thence deflect to the left on a 6 degree 00 minute curve (delta angle 27 degrees 44 minutes 10 seconds) for 462.27 feet and there terminating;

 

Excepting therefrom a triangular parcel, adjoining and westerly of the above-described parallel line and southeasterly of the following described line:

 

Beginning at a point on the above described parallel line, distant 50 feet northerly of its Intersection with the Northerly right of way line of County Road J, running along the South line of said Section 34, thence run Southwesterly to a point on said Northerly right of way line, distant 50 feet westerly of said intersection and there terminating.

 

                     WHEREAS, the Blaine Planning Commission has reviewed said case file on      March 9, 2021; and

 

                     WHEREAS, the Blaine Planning Commission has recommended subdivision Case File No. 21-0004 be approved subject to certain stipulations; and

 

                     WHEREAS the Blaine City Council has reviewed said case file on April 5, 2021.

 

                     NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Blaine that preliminary plat approval per Section 74-42 of the subdivision regulations is hereby granted for Blaine 35 Business Park permitting preparation of a final plat for approval per Section 74-43 subject to the following conditions:

 

1.                     Park dedication for the platted lots becomes due at final plat approval, based on the industrial rate in effect at the time of development for the 24.49 total acres of upland within the plat. If final platted in 2021, the industrial rate of $6,702 per acre, will result in a total park dedication payment of $164,132. Park dedication must be paid prior to release of final plat mylars for recording.

2.                     Dedication of utility and drainage easements along lot lines and over delineated wetlands.

3.                     No site work will be allowed until a RCWD permit has been obtained.

4.                     Grading may not begin until the City has approved a final grading plan. Soil boring information a geotechnical report is required.

5.                     A National Pollutant Discharge Elimination System (NPDES) Phase II permit is required from the MN Pollution Control Agency. Building permits or site plan approval will not be issued until a copy of the application is received by the City.

6.                     The developer will be responsible for installation of sanitary sewer, water main, storm drainage improvements, paved driveways and parking areas. Plans and specifications require approval by the City prior to start of construction.

7.                     All internal utilities shall be maintained privately by the development association, including storm water treatment features.

8.                     Water Availability Charges (WAC) and Sewer Availability Charges (SAC) become due with each building permit. WAC will be due for 7.51 acres for Building A, 7.08 acres for Building B, and 9.9 acres for Building C.

9.                     The Mayor and City Manager are hereby authorized to sign and execute any and all documents, agreements and releases necessary for the approval, recording and administration of the Blaine 35 Business Park.

 

PASSED by City Council of the City of Blaine this 5th day of April, 2021.