Blaine logo
File #: RES 21-057    Version: 1 Name: Final Plat - Hennum Meadows 2nd (21-0002)
Type: Resolution Status: Passed
File created: 4/5/2021 In control: City Council
On agenda: 4/5/2021 Final action: 4/5/2021
Title: Granting Final Plat Approval to Subdivide a 0.97 Acre Parcel into Three Single Family Lots to be Known as Hennum Meadows 2nd Addition. Daniel Hennum (Case File No. 21-0022/SLK)
Attachments: 1. Attachments

DEVELOPMENT BUSINESS - Lori Johnson, City Planner

 

Title

Granting Final Plat Approval to Subdivide a 0.97 Acre Parcel into Three Single Family Lots to be Known as Hennum Meadows 2nd Addition. Daniel Hennum (Case File No. 21-0022/SLK)

 

Executive Summary

This application is a request to final plat a 0.97 acre parcel into three single family lots. The final plat is consistent with the preliminary plat approved in June 2019 with an extension granted in January 2020.

 

Schedule of Actions

Planning Commission Public Hearing

05/14/19

City Council (Preliminary Plat)

06/03/19

City Council (Pre-Plat Extension)

01/06/20

City Council (Final Plat)

04/05/21

 

Background

Staff report prepared by Shawn Kaye, Associate Planner.

 

On June 3, 2019, the applicant received approval of a preliminary plat from the City Council for a subdivision known as Hennum Meadows 2nd Addition that includes 0.97 acres and three single family lots.

 

On January 6, 2020 the applicant received approval of a preliminary plat extension from the Council. The applicant has been working with the Coon Creek Watershed related to ponding issues and anticipates starting the project in summer 2021.

 

The proposed plat contains three single-family lots to be known as Hennum Meadows 2nd Addition. The existing home on Lot 1 will remain, however, there are two detached accessory structures on Lots 2 and 3 that will be required to be removed prior to the plat being recorded with Anoka County. All of the lot sizes exceed the minimum lot size requirement of the R-1 zoning district, which is 10,000 square feet. The lot sizes range from 10,914 square feet to 19,382 square feet.

 

Park dedication will be required for the two new lots proposed within the plat. The City’s current park dedication rate for single family lots is $4,449 per unit (2021 rate). A total park dedication fee of $8,898 would become due prior to final plat mylars being released to the developer for recording at Anoka County.

 

The plat will be graded to preserve as many trees as possible on these lots.

                     

Please note that we do not need to obtain house product information for this approval because it is an infill plat with a specific zoning designation. All of the houses must simply meet the requirements of the R-1 zoning district.

 

The existing home (Lot 1) has a circular drive on Jackson Street/102nd Lane that will be required to be removed and established with grass. The existing driveway off  102nd Lane that accesses the existing home’s garage will need to be constructed to connect to the existing garage on Lot 1 as shown on the grading plan.

 

The preliminary plat shows a portion of the existing Jackson Street right-of-way to be vacated. At this time however, staff feels that the right-of-way should remain in place until the parcel west of Jackson Street develops, allowing future development additional flexibility.

 

Developer will need to obtain a Coon Creek Watershed permit prior to city plan approval. Infiltration of water runoff is required for the plat. Those lots that will contain an infiltration basin will be required to maintain it in accordance with the approved watershed permit. These lots will need to have a maintenance agreement included with the purchase agreement and shall clearly spell out the requirements and responsibility of the homeowner.

 

Construction of the infiltration basin proposes a drain tile connection to an existing catch basin off of the plat. The developer will need to obtain written permission from existing property owners affected by the drain tile construction prior to any plan approval by the City.

 

The final plat is consistent with the approved preliminary plat extension, Resolution No. 20-08.

 

Strategic Plan Relationship

This item is consistent with the strategic plan goal related to maintaining current growth by developing properly guided and zoned lots.

 

Board/Commission Review

The Planning Commission voted unanimously to recommend approval of the preliminary plat in May 2019. There were no comments at the public hearing.

 

Planning Commission review is not required for a final plat.

 

A preliminary plat extension was granted on January 6, 2020 by the City Council.

 

Financial Impact

Not Applicable.

 

Public Outreach/Input

The public hearing notice for the preliminary plat was sent to property owners within 350 feet of the property lines of the parcel being subdivided. No notification is required for a final plat.

 

Staff Recommendation

By motion, approve the Resolution.

 

Attachment List

Zoning and Location Map

Final Plat

 

Body

                     WHEREAS, an application has been filed by PD and H Properties LLC as subdivision Case No. 21-0022; and

 

                     WHEREAS, said case involves the division of land in Anoka County, Minnesota, described as follows:

 

Lot 1, Block 1, PAUL DANIEL ADDITION

 

                     WHEREAS, the Blaine City Council granted preliminary plat approval on May 14, 2019 and preliminary plat extension approval on January 6, 2020 subject to the stipulations as contained in Blaine City Council Resolution No. 20-08; and

 

                     WHEREAS, the applicant has submitted a final plat in general conformance with the approved preliminary plat.

 

                     NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Blaine that final plat approval for Hennum Meadows 2nd Addition per Section 74-43 of the subdivision regulations is hereby granted subject to the following conditions:

 

1.                     Park dedication will be required for the two new lots proposed within the plat. The City’s current park dedication rate for single family lots is $4,449 per unit (2021 rate). A total park dedication fee of $8,898 would become due prior to final plat mylars being released to the developer for recording at Anoka County.

2.                     Developer to obtain a permit from Coon Creek Watershed District prior to city plan approval.

3.                     Written permission to access property must be received from properties affected by construction prior to city plan approval.

4.                     Homeowners shall be required to maintain infiltration basins.

5.                     Standard WAC (Water Access) and SAC (Sewer Access) fees will be due with each home constructed.

6.                     Demolition permits must be obtained for the removal of the larger existing accessory structure.

7.                     The accessory buildings located on proposed Lots 2 and 3, will be required to be removed prior to the plat being recorded with Anoka County.

8.                     The existing home (Lot 1) has a circular drive on Jackson Street/102nd Lane that will be required to be removed and established with grass. These modifications to take place prior to city plan approval.

9.                     The existing driveway off of 102nd Lane that accesses the existing home’s garage will need to be constructed on Lot 1 as shown on the grading plan, prior to any building permits being issued for the plat.

10.                     Execution and recording of a Site Improvement Performance Agreement outlining the developer responsibilities for grading and development of the property.

11.                     The Mayor, City Clerk and City Manager are hereby authorized to execute any and all necessary documents, agreement and releases related to the approval, recording or administration of Hennum Meadows 2nd Addition.

 

PASSED by the City Council of the City of Blaine this 5th day of April, 2021.