File #: ORD 18-2397    Version: Name: 17-52 New Elementary School - Rezone
Type: Ordinance Status: Passed
File created: 2/15/2018 In control: City Council
On agenda: 2/1/2018 Final action: 2/15/2018
Title: SECOND READING REZONING FROM FR (FARM RESIDENTIAL) TO DF (DEVELOPMENT FLEX) AT 12576 LEVER STREET NE. ANOKA-HENNEPIN SCHOOL DISTRICT/ANDERSON-JOHNSON ASSOCIATES, INC. (CASE FILE NO. 17-0052/LSJ)
Sponsors: Bryan Schafer
Attachments: 1. Elementary School - attachments.pdf

DEVELOPMENT BUSINESS - Bryan K. Schafer, Planning and Community Development Director

 

Title

SECOND READING

 

REZONING FROM FR (FARM RESIDENTIAL) TO DF (DEVELOPMENT FLEX) AT 12576 LEVER STREET NE.  ANOKA-HENNEPIN SCHOOL DISTRICT/ANDERSON-JOHNSON ASSOCIATES, INC.  (CASE FILE NO. 17-0052/LSJ)

 

Schedule of Actions

Planning Commission (Public Hearing)

01/09/18

City Council (1st Reading)

02/01/18

City Council (2nd Reading)

02/15/18

Action Deadline

02/08/18

 

Planning Commission Action

The Planning Commission voted unanimously to approve the rezoning. There were no comments at the public hearing.

 

Background

In November 2017, voters in the Anoka-Hennepin School District approved a referendum that would finance the construction of a new elementary school and improvements to the Blaine High School.  The Planning Commission reviewed the conditional use permit amendment related to the Blaine High School improvements in December 2017.  At this time the school district has applied for a rezoning and a conditional use permit that will allow for the construction of the new elementary school. 

 

The new elementary school will be located on the northwest corner of Lever Street and 125th Avenue.  This parcel currently has a home and accessory structures that will be removed for the construction of the school.  The size of the overall site is 38 acres with a current zoning designation of FR (Farm Residential) and a land use of LDR (Low Density Residential.)

 

Rezoning

The applicant has applied for a rezoning of the site to DF (Development Flex) to provide some flexibility in requirements and to be consistent with surrounding and future zoning designations in this neighborhood.  While the properties surrounding the parcel currently are also zoned FR (Farm Residential), it is anticipated that with future development of this area the zoning of the adjacent parcels will change to DF, as this zoning designation is used for all new residential projects that are not considered infill projects. 

 

The existing land use of the property of LDR (Low Density Residential) would allow for the school use of the property. 

 

Conditional Use Permit

The proposed elementary school would be a two-story structure that is 136,000 square feet in size.  The school would consist of 44 classrooms that would serve approximately 1,000 students in grades K-5.  There will also be a PreK curriculum offered at the school as well.  The construction, if the project is approved by the City Council, would begin in Spring 2018 with completion in July 2019.  It is anticipated that the school would be open for the 2019/2020 school year. 

 

The site plan indicates that there would be a parking field of 154 stalls on the east side of the site with a service road that encircles the building for bus access on the west side of the site.  The bus parking area on the west side of the site would also be used for event parking.  The parking that is provided is consistent with ordinance requirements for schools. 

 

The developer is required to perform a traffic study to identify the impacts of traffic from a proposed school of this size.  The study will need to include potential impacts to the intersection of 125th Avenue and Lever Street and the impacts of the two accesses on Lever Street.  The developer will also be obligated to any plat review comments as specified by Anoka County.  

 

The property owner of this parcel, together with other property owners along Lever Street have petitioned for trunk sanitary sewer, water main, and street improvements to be constructed to serve the parcel.  A feasibility report was prepared and presented to the City Council on June 1, 2017.  The report identified assessments that each parcel on Lever Street would pay for the proposed improvements.  The estimated cost for the property owner of this parcel is estimated at $367,353.  The Blaine City Council held a public hearing and ordered improvements on July 13, 2017 (City Project No. 17-07).  ISD 11 will be responsible for paying assessments for the improvements.

 

It is anticipated that the city project, to install the trunk sanitary sewer and trunk water main along Lever Street NE from 125th Avenue NE to serve properties along Lever Street NE, will be Spring/Summer of 2018.

 

Trunk Sanitary Sewer area charges become due with development of the parcel.  The 2018 rate of $6,632/upland acre for Sanitary Sewer District 7 will apply.

 

This parcel, which is currently a metes and bounds description, needs to be platted.  There are several items that will be required to be dedicated such as standard utility and drainage easements over areas of delineated wetlands, wetland mitigation, infiltration trenches, drainage swales, and storm water management ponds. Other dedicated easements such as trail and roadway easements along Lever Street and the County will most likely want the frontage along 125th Avenue (CSAH 14) as a Dedicated Right of Access.   A preliminary plat application must be submitted prior to issuance of a building permit for the school.  The plat application and building permit application can be processed concurrently.

 

The site requires a National Pollutant Discharge Elimination System (NPDES) Phase II General Storm Water Permit for Construction Activity from Minnesota Pollution Control Agency (MPCA).  A prerequisite to the MPCA permit application includes preparation of a site Storm Water Pollution Prevention Plan (SWPPP) for the development site.

 

Rice Creek Watershed District review and permit is required.

 

Also on site are two softball fields, an open play area and two soft play areas on the west side of the site.  School officials and the City’s Park and Recreation Department have been discussing how the City and the school can collaborate on the usage of the playground equipment for both school and community use.  Details of this collaboration may involve some credit against the park dedication payment that will be required. The details of this agreement will be shared prior to final plat approval, as it was mentioned above that a plat will be required for development of the school.  The school will be required to pay park dedication for this site as it is required upon development of parcels that have never been charged for park dedication.  The park dedication rate used for schools is calculated by using the underlying land use of the parcel, which is LDR (Low Density Residential.).  Therefore the residential rate is applied to the upland/usable portion of the site (excluding the ball fields) based on a potential unit count of 2.5 units per acre, as this is what would be allowed on this site if it were to be used for residential purposes.  Park dedication for this site has been calculated as such:

                                          

                     12.5 acres used multiplied by 2.5 units per acre is 31 units. 

                     31 units multiplied by the 2018 residential rate of $4,320 is $133,920. 

 

This payment would be required prior to release of final plat mylars for recording at Anoka County.

 

The landscape plan that has been provided for this site meets the zoning ordinance requirements.  A large number of trees will be saved on site, but there will be trees taken out where the school is located on the parcel.  The City’s tree replacement ordinance is being met through the large amount of landscaping required and provided on site. 

 

The two-story building is proposed to be finished with face brick, metal and glass.  It is suggested that glass and metal accents be added to the elevation that is noted as elevation #4 to break up the large brick wall and to make all four sides consistent with one another. 

 

Site Plan approval is required prior to any work being performed on site.  Site Plan approval will not be granted until a Site Improvement Performance Agreement and the associated financial guarantees have been submitted. 

 

Prior to issuance of site plan approval the applicant will need to provide details on how trash will be handled on site and where any enclosures will be located and what they will look like. 

 

All lighting must meet the requirements of the Zoning Ordinance.  All lighting must be downlit and shielded to prevent glare or spill.  Free standing light poles are limited to no more than 20 feet in height. 

 

All signage to meet the requirements of the zoning ordinance. 

 

Recommendation

By motion, approve the Resolution.

 

Attachments

Zoning and Location Map

Narrative

Site Plan

Grading and Drainage Plan

Utility Plan

Landscaping Plan

Exterior Elevations

Floor Plans

 

Body

THE CITY OF BLAINE DOES ORDAIN:  (Added portions are underscored and deleted portions are shown in brackets with overstrike.)

 

Section 1.                      The Official Zoning Map of the Zoning Code of the Municipal Code of the City of Blaine is hereby amended to change the zoning classification of the following described property:

 

THE SE1/4 OF SW1/4 OF SEC 1 TWP 31 RGE 23, EX RD, SUBJ TO EASE OF REC

 

Section 2.                     The above described property is hereby rezoned from:

 

[FR (Farm Residential)]

to

DF (Development Flex

 

Section 3.                     The City Manager is hereby directed to make the appropriate changes in the Official Zoning Map of the City of Blaine to reflect and show the changes in zoning classification as set forth above.

 

INTRODUCED and read in full this 1st day of February, 2018.

 

PASSED by the City Council of the City of Blaine this 15th day of February, 2018.