File #: RES 13-143    Version: 1 Name: 13-49 Lakes 56th Addition
Type: Resolution Status: Passed
File created: 9/5/2013 In control: City Council
On agenda: Final action: 9/5/2013
Title: FINAL PLAT APPROVAL TO SUBDIVIDE 8.44 ACRES INTO 34 SINGLE FAMILY LOTS TO BE KNOWN AS THE LAKES OF RADISSON FIFTY-SIXTH ADDITION AT 123RD LANE/MIDWAY CIRCLE. CAPSTONE HOMES. (CASE FILE NO. 13-0049/SLK)
Sponsors: Bryan Schafer
Attachments: 1. Lakes 56th Addition - Attachments.pdf
ITEM:         11.5         DEVELOPMENT BUSINESS - Bryan K. Schafer, Planning and Community Development Director
 
Title
FINAL PLAT APPROVAL TO SUBDIVIDE 8.44 ACRES INTO 34 SINGLE FAMILY LOTS TO BE KNOWN AS THE LAKES OF RADISSON FIFTY-SIXTH ADDITION AT 123RD LANE/MIDWAY CIRCLE. CAPSTONE HOMES. (CASE FILE NO. 13-0049/SLK)
      
Schedule of Actions
City Council (Preliminary Plat)
02/17/05
City Council (Final Plat)
09/05/13
 
Background
 
The Lakes of Radisson 56th Addition adds 34 single-family lots to "The Lakes" development.  Sharper Homes originally proposed to construct 53 small lot single-family detached homes in this plat, but only completed construction on 19 of the lots.  Capstone Homes has now purchased the land and is proposing a small lot single-family product that is similar to the product that was previously constructed by Sharper Homes.  Product information has been attached as background information and will be guided by the standards contained in the Conditional Use Permit issued by the City Council in 2005 (CUP Resolution 05-42).
 
The small lot single-family homes will have to meet the setbacks described in the previously approved conditional use permit conditions of resolution 05-42.  The City will be requiring that the minimum square footage above grade be 1,240 square feet with a maximum building pad size of 40 feet in width.  In addition no side entries will be allowed on the small lot single family homes.
 
The final plat is consistent with the approved preliminary plat, Resolution No. 05-41. With this final plat of 34 lots the City will have approved 2,546 lots in The Lakes of Radisson development.
Because of the time lag between initial development (2006) and the proposed second phase neighborhood notice was sent.
 
Recommendation
By motion, approve the Resolution.
 
Attachments
Final Plat
Building Elevations and Floor Plans
Resolution 05-42 (Current CUP)
 
Body
      WHEREAS, an application has been filed by Capstone Homes as subdivision Case No. 13-0049; and
 
      WHEREAS, said case involves the division of land in Anoka County, Minnesota, described as follows:
 
OUTLOT C, THE LAKES OF RADISSON FORTY-THIRD ADDITION, ANOKA COUNTY, MINNESOTA.
 
      WHEREAS, the Blaine City Council granted preliminary plat approval on February 17, 2005, subject to the stipulations as contained in Blaine City Council Resolution No. 05-41; and
 
      WHEREAS, the applicant has submitted a final plat in general conformance with the approved preliminary plat.
 
      NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Blaine that final plat approval for The Lakes of Radisson Fifty-Sixth Addition per Section 74-43 of the subdivision regulations is hereby granted subject to the following conditions:
 
1.      All park dedication for the 34 residential units has already been calculated and serves as credit to be given, to the developer, for their effort in developing and deeding the neighborhood parks, trail system, additional park landscaping and lighting, etc. The agreement for credit and payment by the developer is based on the previously approved Park Development Agreement Memo and also based on 3,300 housing units and 11 acres of commercial/retail.
 
2.      A grading, erosion control and sediment control plan must be submitted for City and Coon Creek Watershed District approval prior to work being performed on site.  Lot grading to be consistent with Lakes Water Management Plan.
3.      The size of site being graded requires a National Pollutant Discharge Elimination System (NPDES) Phase II Construction Activity Permit from Minnesota Pollution Control Agency (MPCA).
4.      A development plan, complete with site geotechnical report, soil borings and hydrology calculations, must be submitted to the City Engineer and Coon Creek Watershed District for review and approval prior to work being performed on site.  The development plan must indicate that all structures will be protected from flooding.
5.      Coon Creek Watershed District Permit is required prior to the approval of grading and/or infrastructure improvement plans.
6.      As-built surveys will be required to verify structure elevations and lot grading.
7.      The developer will be responsible for installation of sanitary sewer, water main, storm drainage improvements, storm water treatment, erosion and sediment control, bituminous streets with concrete curb and gutter, streetlights, mailboxes, sidewalks, trails, traffic control signs, street signs, and all appurtenant items.  The City shall approve plans and specifications prior to start of construction.
8.      All City streets, exclusive of parkways, require dedication of 60 feet of right-of-way and shall be constructed to 29 feet back to back of width.
9.      Anoka County Highway Department permit is required for work performed within County right-of-way.
10.      All streets will follow the Anoka County street name grid system.
11.      Standard utility and drainage easements must be dedicated along all lot lines and over drainage ditches, ponds, delineated wetlands, and storm water detention basins.  The Developer is to provide access for maintenance to storm water detention basins.  Restrictions will be placed on lots as needed to limit fences and landscaping to insure access.  
12.      Developer to require homeowner's associations to be responsible for inspection, operation and maintenance of private storm water facilities in the development.  Specific requirements shall be designated and detailed in an agreement/plan submitted to the City with construction plans.
13.      Developer to require homeowner's associations to be responsible for maintenance and upkeep of landscape improvements along and within the right-of-way for all of the parkway style developed streets including "Final Phase Parkway Landscape Set" areas as shown on attached landscape plan.
 
14.      Developer to install grouped mailboxes with design and locations approved by City and US Postal Service.
15.      Execution and recording of a Development Agreement, which sets forth in greater detail the plat conditions as well as other responsibilities for the development of this plat.
16.      Developer shall explore water source for landscape irrigation systems installed throughout the development including the possible use of created ponds, existing wells, or new wells as source of water supply with a moisture sensor installed.
17.      Standard water and sanitary sewer access charges (WAC & SAC) become due with each building permit at the rate established at the time the building permit is issued.
18.      All development signage by separate review.
19.      The City may be required by Anoka County to share in the costs of future improvements to 125th Avenue including intersection improvements, traffic signal installations and roadway widening.  The City reserves its right to assess a portion of such future improvement costs to parcels located within this plat, pursuant to MN Statutes Chapter 429.
20.      The Mayor, City Clerk and City Manager are hereby authorized to execute any and all necessary documents, agreements and releases related to the approval, recording or administration of this plat.
 
PASSED by the City Council of the City of Blaine this 5th day of September 2013.