Blaine logo
File #: RES 13-015    Version: 1 Name: 13-07 Woodland 4th Final Plat
Type: Resolution Status: Passed
File created: 2/7/2013 In control: City Council
On agenda: Final action: 2/7/2013
Title: FINAL PLAT APPROVAL TO SUBDIVIDE 14.47 ACRES INTO 24 SINGLE FAMILY LOTS AND 2 OUTLOTS TO BE KNOWN AS WOODLAND VILLAGE 4TH ADDITION AT 119TH CIRCLE/WOODLAND PKWY. (CASE FILE NO. 13-0007/SLK)
Sponsors: Bryan Schafer
Attachments: 1. Location Map.pdf, 2. Final Plat.pdf
Related files: RES 13-016
ITEM:         11.2         DEVELOPMENT BUSINESS - Bryan Schafer, Planning and Economic Development Coordinator
 
Title
FINAL PLAT APPROVAL TO SUBDIVIDE 14.47 ACRES INTO 24 SINGLE FAMILY LOTS AND 2 OUTLOTS TO BE KNOWN AS WOODLAND VILLAGE 4TH ADDITION AT 119TH CIRCLE/WOODLAND PKWY. (CASE FILE NO. 13-0007/SLK)
 
Schedule of Actions
Planning Commission (Public Hearing)
07/12/05
City Council (Preliminary Plat, CUP)
04/06/06
City Council (Final Plat 4th Addition-CUP Amendment)
02/07/13
 
Background
The preliminary plat, Gardenwood Addition was approved in April 2006. The preliminary plat approval included approval for 118 single family lots.   The applicant is requesting approval to final plat 24 lots that were a part of the original preliminary plat that was approved in 2006.
 
The final plat also includes two outlots for future development and an open space area.
 
The single-family product will be custom built homes.  The single-family lots for these homes are proposed to be typically 85 feet in width, with several being wider and a couple being under this width.  The typical depth is 150 feet, with most of the lots being much larger than this in depth. These homes will be enhanced with impressive exterior architectural details. The homes will include brick, stone, stucco, and varying gables and hip rooflines.
 
It will be necessary to extend Woodland Parkway with this plat.  It is proposed that the Parkway be extended to the northern most limits of the platted right-of-way rather than the north end of the current plat.  This will eliminate a "patchwork" of street construction and provide for a more contiguous roadway.  It is also proposed that 121st Avenue be constructed to the west of Woodland Parkway (prior to July 2014) to provide the connection into the City's future Lexington Avenue athletic complex.
 
The final plat is consistent with the approved preliminary plat, Resolution No. 06-91.
 
Recommendation
By motion, approve the Resolution.
 
Attachments
Zoning and Location Map
Final Plat
 
Body
PER CHAPTER 74 OF THE SUBDIVISION ORDINANCE
 
WHEREAS, an application has been filed by Woodland Development Corporation as subdivision Case No. 13-0007; and
 
WHEREAS, said case involves the division of land in Anoka County, Minnesota, described as follows:
 
OUTLOT A, WOODLAND VILLAGE 3rd ADDITION, ANOKA COUNTY, MINNESOTA; AND
 
LOT 1, BLOCK 6, GARDENWOOD ADDITION, ANOKA COUNTY, MINNESOTA.
 
WHEREAS, the Blaine City Council granted preliminary plat approval on , subject to the stipulations as contained in Blaine City Council Resolution No. 06-91; and
 
WHEREAS, the applicant has submitted a final plat in general conformance with the approved preliminary plat.
 
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Blaine that final plat approval for Woodland Village 4th Addition per Section 74-43 of the subdivision regulations is hereby granted subject to the following conditions:
 
1.      The developer may have responsibility for financial participation in Lexington Avenue NE improvements associated with this development.  This includes, but is not limited to, intersection improvements, traffic signal installations, and roadway widening improvements.  It may be proposed to assess Lots in the plat for these improvements.
2.      All local public streets require dedication of 60 feet of right-of-way and shall be constructed to 29 feet back to back of width.
3.      All streets will follow the Anoka County street name grid system.  
4.      Plans and specifications must be approved by the City prior to start of construction.
5.      Street and utility extensions are required to the edge of the plat for each future connection to the adjacent parcels.  Woodland Parkway must be extended to its northern most right-of-way by October 31, 2013. Certain elements, such as median/boulevard landscaping, trail and sidewalk north of 121st Avenue could be delayed until a later phase.
6.      121st Avenue must be extended west of Woodland Parkway to connect with the City's construction of the Lexington Athletic Complex, by July 31, 2014.
7.      Standard utility and drainage easements must be dedicated along all lot lines and over areas of delineated wetlands, wetland mitigation, infiltration trenches, drainage swales, and storm water management ponds.
8.      The Developer is to provide access for inspection and maintenance of storm water management infrastructure.  Restrictions will be placed on lot lines as needed to limit fences and landscaping to insure access.
9.      Development requires a National Pollutant Discharge Elimination System (NPDES) Phase II General Storm Water Permit for Construction Activity from Minnesota Pollution Control Agency (MPCA).  A prerequisite to the MPCA permit application includes preparation of a site Storm Water Pollution Prevention Plan (SWPPP) for the development site.
10.      Construction contract documents shall include a mass (rough) grading, erosion protection, sediment control, development, utilities, roadway, and storm drainage plan sheets.  Supporting wetland delineation report, geotechnical investigation report, soil boring logs, and hydrology report shall be included in the submittal for City review and approval.
11.      The development plan shall indicate all structures will be protected from flooding.  
12.      A twenty foot buffer strip shall be considered adjacent to wetland edges and shall be placed in an easement.
13.      RCWD permit is required prior to City approval of construction plans and specifications.
14.      The Developer shall process a Letter of Map Amendment with FEMA and shall provide all FEMA paperwork and structure as-built surveys to homeowners at time of lot closing.  Developer is responsible for following through with FEMA as necessary to receive final FEMA documents and to provide those documents to the homeowners, and to record the final documents on the certificate of title for each parcel in the development.
15.      As-built surveys shall be required to verify structure elevations, custom grading requirements, and final lot grading elevations.
16.      Park dedication to be paid for 24 housing units at the 2013 rate of $2,813 per unit.  The total park dedication fee is $67,512.
17.      Developer to submit a landscape plan for Outlot B that is generally consistent with the landscape plan reviewed by the City Council in May 2011. Plan to be submitted and approved prior to City issuance of building permits. Outlot B to be owned and maintained by the Homeowner's Association.
18.      Developer to submit a landscape plan for boulevard and median landscape treatments within the Woodland Parkway extension. Plan to be submitted and approved prior to City issuance of building permits.
19.      Developer to require homeowner's associations to be responsible for maintenance and upkeep of landscape improvements along and within the right-of-way of Woodland Parkway.
20.       Developer to install grouped mailboxes with design and locations approved by City and US Postal Service.
21.      Developer shall explore water source for landscape irrigation systems installed throughout the development including the possible use of created ponds, existing wells, or new wells as source of water supply with a moisture sensor installed.
22.      Water and sanitary sewer availability charges (WAC & SAC) become due with each building permit at the rate established at the time the building permit is issued.
23.      All development signage by separate review.
24.      Execution and recording of a Development Agreement, which sets forth in greater detail the plat conditions as well as other responsibilities for the development of this plat.
 
PASSED by the City Council of the City of Blaine this 7th day of February 2013.