Blaine logo
File #: RES 16-181    Version: 1 Name: 16-52 Parkside N 8th Addn - Final Plat
Type: Resolution Status: Passed
File created: 12/15/2016 In control: City Council
On agenda: 12/15/2016 Final action: 12/15/2016
Title: GRANTING FINAL PLAT APPROVAL TO SUBDIVIDE 3.78 ACRES INTO 21 LOTS AND TWO OUTLOTS TO BE KNOWN AS PARKSIDE NORTH 8TH ADDITION, LOCATED AT 122ND AVE NE/FRAIZER STREET. PAXMAR, LLC. (CASE FILE NO. 16-0052/SLK)
Sponsors: Bryan Schafer
Attachments: 1. Parkside N 8th Addn - Attachments.pdf

DEVELOPMENT BUSINESS - Bryan K. Schafer, Planning and Community Development Director

 

Title

GRANTING FINAL PLAT APPROVAL TO SUBDIVIDE 3.78 ACRES INTO 21 LOTS  AND TWO OUTLOTS TO BE KNOWN AS PARKSIDE NORTH 8TH ADDITION, LOCATED AT 122ND AVE NE/FRAIZER STREET.  PAXMAR, LLC.  (CASE FILE NO. 16-0052/SLK)

 

Schedule of Actions

Planning Commission (Public Hearing)

07/14/15

City Council (Preliminary Plat)

08/06/15

City Council (Final Plat)

12/15/16

 

Background

The applicant is proposing to subdivide one outlot into 21 single family detached units. Parkside North 8th Addition consists of subdividing approximately 3.78 acres into a subdivision with 21 dwelling units and two outlots.  One outlot is for the private street and the other outlot is over a wetland and drainage area.

 

This is the 2nd and final phase for this development of small lot detached townhomes. City Council approval was granted for the construction of all 45 units in August of 2015.

 

Engineering Items

Developer to dedicate a drainage, utility and access easement over proposed Outlot A. 

 

A rough grading and sediment control plan must be submitted for City approval prior to work being performed on site. Erosion control details shall be included on the grading plan. Proposed lot grading will need to be consistent with the approved master site grading plan for the Parkside Development. 

 

The size of site being graded requires a National Pollutant Discharge Elimination System (NPDES) permit from Minnesota Pollution Control Agency. A development plan must be submitted for City approval prior to issuance of the first building permit. The development plan must indicate that all structures will be protected from flooding.

 

Rice Creek Watershed District permit is required prior to the City approving any work on site.

 

The developer shall process a Letter of Map Change with FEMA prior to issuance of building permits within the unnumbered A-Zone on the FEMA flood map. Developer shall provide all FEMA paperwork and structure as-built surveys to homeowners at time of lot closing.  Developer is responsible for following through with FEMA as necessary to receive final FEMA documents and to provide those documents to the homeowners, and to record the final documents on the certificate of title for each parcel in the development.

 

As-built surveys will be required to verify structure elevations and lot grading for each structure constructed.

 

The developer will be responsible for installation of sanitary sewer, water main, storm drainage improvements, streets with concrete curb and gutter, streetlights, mailboxes, traffic control signs, street signs, and all appurtenant items.  Plans and specifications must be approved by the City prior to start of construction. All streets shall be constructed to City Standards for width based on parking configuration. Private streets or alley can be constructed to a minimum of 22 feet in width if signed “No Parking”. Private 24-foot wide streets can be parked on one side provided “NO PARKING FIRE LANE” signs are posted every 75 feet on the opposite side of the drive.

 

Standard utility and drainage easements must be dedicated along all lot lines and over drainage ditches, ponds, delineated wetlands, and storm water detention basins. Developer to provide access to existing power lines in plat. The Developer is to provide access for maintenance of storm water detention basins. Restrictions will be placed on lots as needed to limit fences and landscaping to insure access.

 

Developer to require homeowner’s associations to be responsible for maintenance and upkeep of all utilities, streets, storm drainage improvements, infiltration basins, and landscape improvements in the development.  Developer shall provide documentation to the homeowner’s association, with copies to the City, about maintenance procedures for the improvements.

 

Developer to install grouped mailboxes with design and locations approved by City and US Postal Service.

 

Standard water and sanitary sewer access charges (WAC & SAC) become due with each building permit at the rate established at the time the building permit is issued.

 

All development signage by separate review.

 

The final plat is consistent with the approved preliminary plat, Resolution No. 15-133.

 

Recommendation

By motion, approve the Resolution.

 

Attachments

Zoning and Location Map

Final Plat

 

Body

                     WHEREAS, an application has been filed by Paxmar, LLC as subdivision Case No. 16-0052; and

 

                     WHEREAS, said case involves the division of land in Anoka County, Minnesota, described as follows:

 

Outlot D, PARKSIDE NORTH, according to the recorded plat thereof, Anoka County, Minnesota.

 

                     WHEREAS, the Blaine City Council granted preliminary plat approval on August 6, 2015, subject to the stipulations as contained in Blaine City Council Resolution No. 15-133; and

 

                     WHEREAS, the applicant has submitted a final plat in general conformance with the approved preliminary plat.

 

                     NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Blaine that final plat approval for Parkside North 8th Addition per Section 74-43 of the subdivision regulations is hereby granted subject to the following conditions:

 

1.                     Park dedication will be due with the final platting of the twenty one (21) lots at the 2011 rate of $2,435 per lot. The total payment of $51,135 will be applied as a credit against the original $1.4 Million that was owed by the City for the purchase of the Lexington Athletic Complex property.

2.                     The size of site being graded requires a National Pollutant Discharge Elimination System (NPDES) permit from Minnesota Pollution Control Agency.

3.                     A development plan must be submitted for City approval prior to issuance of the first building permit. The development plan must indicate that all structures will be protected from flooding. A rough grading and sediment control plan must be submitted for City approval prior to work being performed on site. Erosion control and tree preservation details shall be included on the grading plan. Lot grading to be consistent with the approved master grading plan for the Parkside North development.

4.                     Rice Creek Watershed District permit is required prior to the approval of grading.

5.                     The developer shall process a Letter of Map Change with FEMA prior to issuance of building permits within the unnumbered A-Zone on the FEMA flood map. Developer shall provide all FEMA paperwork and structure as-built surveys to homeowners at time of lot closing.

6.                     Developer is responsible for following through with FEMA as necessary to receive final FEMA documents and to provide those documents to the homeowners, and to record the final documents on the certificate of title for each parcel in the development.

7.                     As-built surveys will be required to verify structure elevations and lot grading for each structure constructed.

8.                     The developer will be responsible for installation of sanitary sewer, water main, storm drainage improvements, streets with concrete curb and gutter, streetlights, mailboxes, sidewalks, traffic control signs, street signs, and all appurtenant items.  Plans and specifications must be approved by the City prior to start of construction.

9.                     All Private streets or alley can be constructed to a minimum of 22 feet in width if signed “No Parking”. Private 24-foot wide streets can be parked on one side provided “NO PARKING FIRE LANE” signs are posted every 75 feet on the opposite side of the drive.

10.                     Standard utility and drainage easements must be dedicated along all lot lines and over drainage ditches, ponds, delineated wetlands, and storm water detention basins.  Existing easements on underlying properties must be vacated before the plat is recorded.  Developer to provide access to existing power lines in plat. The Developer is to provide access for maintenance of storm water detention basins. Restrictions will be placed on lots as needed to limit fences and landscaping to insure access.

11.                     Developer to require homeowner’s associations to be responsible for maintenance and upkeep of all utilities, streets, storm drainage improvements, infiltration basins, driveways and landscape improvements in the development.  Developer shall provide documentation to the homeowner’s association, with copies to the City, about maintenance procedures for the improvements.

12.                     Developer to install grouped mailboxes with design and locations approved by City and US Postal Service. Maintenance of the mailboxes to be the responsibility of the homeowner’s association.

13.                     Standard water and sanitary sewer access charges (WAC & SAC) become due with each building permit at the rate established at the time the building permit is issued. WAC payments that are paid with each building permit will be reimbursed to the Developer as part of the original $1.4M owed by the City for purchase of the land for the Lexington Athletic Complex.

14.                     All development signage by separate review.

15.                     Landscaping for Parkside North 8th Addition common areas and along the streets to be completed as shown on the approved Site Plan.

16.                     The landscape plan to be approved through a site plan approval process.

17.                     The Mayor, City Clerk and City Manager are hereby authorized to execute any and all necessary documents, agreement and releases related to the approval, recording or administration of Parkside North 8th Addition.

 

PASSED by the City Council of the City of Blaine this 15th day of December 2016.