File #: RES 14-152    Version: 1 Name: 14-36 Woodland Village 7th - FInal Plat
Type: Resolution Status: Passed
File created: 8/21/2014 In control: City Council
On agenda: 8/21/2014 Final action: 8/21/2014
Title: GRANTING FINAL PLAT APPROVAL TO SUBDIVIDE 6.13 ACRES INTO 21 SINGLE FAMILY LOTS TO BE KNOWN AS WOODLAND VILLAGE 7th ADDITION AT WOODLAND PKWY/GHIA STREET NE. WOODLAND DEVELOPMENT CORPORATION. (CASE FILE NO. 14-0036/SLK)
Attachments: 1. Woodland Village 7th - Final Plat
DEVELOPMENT BUSINESS - Bryan K. Schafer, Planning and Community Development Director
 
Title
GRANTING FINAL PLAT APPROVAL TO SUBDIVIDE 6.13 ACRES INTO 21 SINGLE FAMILY LOTS TO BE KNOWN AS WOODLAND VILLAGE 7th ADDITION AT WOODLAND PKWY/GHIA STREET NE. WOODLAND DEVELOPMENT CORPORATION. (CASE FILE NO. 14-0036/SLK)
 
Schedule of Actions
Planning Commission (Public Hearing)
07/08/14
City Council (Preliminary Plat and CUP)
08/07/14
City Council (Final Plat)
08/21/14
 
Background
      
The final plat proposal consists of subdividing approximately 6.13 acres into a subdivision with a total of 21 lots creating single family residential units.
Because the developer is proposing different housing styles with different design issues, platting requirements, lot sizes, markets and price ranges, the existing DF (Development Flex) zoning is proposed to establish the minimum standards for each of these areas.  
 
Neighborhood Description      
In summary, The Woodland Village 7th Addition is proposed to contain the following:
 
Area West of Ghia Street (Lots 1-21 Block 1)
ยท      21- Single-Family Lots (75 foot wide lots)
 
The area west of Ghia Street will be a single-family product with custom built homes.  The single-family lots for these homes are proposed to be typically 75 feet in width.  The typical depth is around 125 feet. The homes will include some brick and stone.  The floor plans would provide 2,200+ square feet of finished area for two story homes.  The estimated price of this product is $350,000-$375,000.
 
Park dedication will be required for all units.
 
Engineering Items
The City may be required by Anoka County to share in the costs of future signal and intersection improvements to Lexington Avenue.  The City will be required to cost share in these improvements and this amount will proposed to be assessed to benefitting parcels including those in the plat.
 
Currently the Developer is working on testing and if necessary, removing, contaminated material from the site.  This work is partially funded by the Livable Communities Grant as well as City EDA funds.  The City and Developer have a Site Improvement Performance Agreement in place to ensure the completion of the work.
 
The Developer is proposing to construct private streets.  For parking on both sides, the streets must be a minimum of 29 feet back to back of width.  All streets will follow the Anoka County street name grid system.  
 
Standard utility and drainage easements must be dedicated along all lot lines and over areas of delineated wetlands, wetland mitigation, infiltration trenches, drainage swales, and storm water management ponds. The Developer is to provide access for inspection and maintenance of storm water management infrastructure.  Restrictions will be placed on lot lines as needed to limit fences and landscaping to insure access.  Design of land-locked storm water features must be based on two back-to-back 100-year storm events or an over-land overflow must be provided. The development requires a National Pollutant Discharge Elimination System (NPDES) Phase II General Storm Water Permit for Construction Activity from Minnesota Pollution Control Agency (MPCA).  A prerequisite to the MPCA permit application includes preparation of a site Storm Water Pollution Prevention Plan (SWPPP) for the development site.
 
Rice Creek Watershed District review and permit is required prior to the start of any work associated with the plat improvements.
 
Construction contract documents shall include a mass (rough) grading, erosion protection, sediment control, development, utilities, roadway, and storm drainage plan sheets.  Plans shall detail wetland information, tree preservation, erosion protection, sediment control, proposed grading contours, utilities, roadway geometrics, storm drainage, storm water quality management, custom lot-grading, house type, and house elevation information.  The development plan shall indicate all structures will be protected from flooding.  
 
A Letter of Map Revision was issued by FEMA in 2008, revising the flood map for the area.  The Developer shall process any necessary FEMA Letter of Map Amendments and provide structure as-built surveys to homeowners at time of lot closing.  Developer is responsible for following through with FEMA as necessary to receive final FEMA documents and to provide those documents to the homeowners, and to record the final documents on the certificate of title for each parcel in the development.
 
As-built surveys shall be required to verify structure elevations, custom grading requirements, and final lot grading elevations.
 
Development roadway drives and utilities (sanitary, water main, storm water management) outside of the public right-of-way shall be considered private, but shall be constructed per the City of Blaine's Standard Specifications.  Future inspections, operations, and maintenance shall be the responsibility of the development association.
 
By motion, approve Resolution No. 14-147.
 
Recommendation
By motion, approve the Resolution.
 
Attachments
Zoning and Location Map
Final Plat
 
Body
      WHEREAS, an application has been filed by Woodland Development Corporation as subdivision Case No. 14-0036; and
 
      WHEREAS, said case involves the division of land in Anoka County, Minnesota, described as follows:
 
OUTLOTS C AND D, GARDENWOOD, OUTLOT A, WOODLAND VILLAGE 4th ADDITION AND OUTLOT A, WOODLAND VILLAGE 6th ADDITION, ANOKA COUNTY, MINNESOTA.
 
      WHEREAS, the Blaine City Council granted preliminary plat approval on August 7, 2014, subject to the stipulations as contained in Blaine City Council Resolution No. 14-147; and
 
      WHEREAS, the applicant has submitted a final plat in general conformance with the approved preliminary plat.
 
      NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Blaine that final plat approval for Woodland Village 7th Addition per Section 74-43 of the subdivision regulations is hereby granted subject to the following conditions:
 
1.      The City may be required by Anoka County to share in the costs of future signal and intersection improvements to Lexington Avenue.  The City will be required to cost share in these improvements and this amount will proposed to be assessed to benefitting parcels including those in the plat.
2.      All private streets shall be constructed to 29 feet back to back of width.
3.      All streets will follow the Anoka County street name grid system.  
4.      Plans and specifications must be approved by the City prior to start of construction.
5.      Street and utility extensions are required to the edge of the plat for each future connection to the adjacent parcels.
6.      Standard utility and drainage easements must be dedicated along all lot lines and over areas of delineated wetlands, wetland mitigation, infiltration trenches, drainage swales, and storm water management ponds.
7.      The Developer is to provide access for inspection and maintenance of storm water management infrastructure.  Restrictions will be placed on lot lines as needed to limit fences and landscaping to insure access.
8.      Development requires a National Pollutant Discharge Elimination System (NPDES) Phase II General Storm Water Permit for Construction Activity from Minnesota Pollution Control Agency (MPCA).  A prerequisite to the MPCA permit application includes preparation of a site Storm Water Pollution Prevention Plan (SWPPP) for the development site.
9.      Construction contract documents shall include a mass (rough) grading, erosion protection, sediment control, development, utilities, roadway, and storm drainage plan sheets.  Supporting wetland delineation report, geotechnical investigation report, soil boring logs, and hydrology report shall be included in the submittal for City review and approval.
10.      The grading plan shall provide greater detail on protecting existing trees and providing additional information on adjacent property.  The development plan shall indicate all structures will be protected from flooding.  
11.      A twenty foot buffer strip shall be considered adjacent to wetland edges and shall be placed in an easement.
12.      RCWD permit is required prior to City approval of construction plans and specifications.
13.      The Developer shall process a Letter of Map Amendment with FEMA and shall provide all FEMA paperwork and structure as-built surveys to homeowners at time of lot closing.  Developer is responsible for following through with FEMA as necessary to receive final FEMA documents and to provide those documents to the homeowners, and to record the final documents on the certificate of title for each parcel in the development.
14.      As-built surveys shall be required to verify structure elevations, custom grading requirements, and final lot grading elevations.
15.      Development roadway drives and utilities (sanitary, water main, storm water management) outside of the public right-of-way shall be considered private and future inspections, operations, and maintenance shall be the responsibility of the homeowner's association.
16.      Park dedication to be paid for 21 housing units at the rate in effect at the time of final plat. The 2014 rate is $3,094 per lot for a total of $64,974.
17.      Developer to install grouped mailboxes with design and locations approved by City and US Postal Service.
18.      Private streets can be constructed to a minimum of 22 feet in width if signed "No Parking". Private 24-foot wide streets can be parked on one side provided "NO PARKING FIRE LANE" signs are posted every 75 feet on the opposite side of the drive.
19.      Developer shall explore water source for landscape irrigation systems installed throughout the development including the possible use of created ponds, existing wells, or new wells as source of water supply with a moisture sensor installed.
20.      Water and sanitary sewer availability charges (WAC & SAC) become due with each building permit at the rate established at the time the building permit is issued.
21.      All development signage by separate review.
22.      Execution and recording of a Development Agreement or SIPA, which sets forth in greater detail the plat conditions as well as other responsibilities for the development of this plat.
23.      Developer to prepare a landscape plan for the 300 feet of frontage on Lexington Avenue that contains a minimum of 15 overstory deciduous trees and 30 conifer trees or an alternative plan with a mixture of conifer and overstory trees combined with a 6-foot high privacy fence. Plan to be submitted and approved by the City prior to release of Plat.
24.      The Mayor, City Clerk and City Manager are hereby authorized to execute any and all necessary documents, agreements and releases related to the approval, recording or administration of Woodland Village 7th Addition.
 
PASSED by the City Council of the City of Blaine this 21st day of August 2014.