Blaine logo
File #: MO 12-122    Version: 1 Name: Accepting the Proposal for Park Planning Services for Lexington Athletic Complex from Carlson-McCain
Type: Motion Status: Passed
File created: 9/20/2012 In control: City Council
On agenda: Final action: 9/20/2012
Title: ACCEPTING THE PROPOSAL FOR PARK PLANNING SERVICES FOR LEXINGTON ATHLETIC COMPLEX FROM CARLSON-McCAIN AT THE ESTIMATED COST OF $162,750.
Sponsors: Jim Kappelhoff
Attachments: 1. RFP Comparisons-CC.pdf
Related files: RES 14-088
ITEM:         12.4         ADMINISTRATION- Jim Kappelhoff
 
Title
ACCEPTING THE PROPOSAL FOR PARK PLANNING SERVICES FOR LEXINGTON ATHLETIC COMPLEX FROM CARLSON-McCAIN AT THE ESTIMATED COST OF $162,750.
 
Background
A Request for Proposal (RFP) for consultant services to develop the Lexington Athletic Complex was sent to five companies. All submitted proposals. A company comparison of proposed estimated hours, cost estimates and relevant experience is attached.   
 
The following three major components were required in the proposal:
 
1.      Project Management Meetings with City of Blaine Staff.  
Meetings for project kick-off, progress, preliminary design, final review of construction plans, and pre-construction.
 
2.      Design Services.
Topography, soil boring, site hydrology, preliminary design plans and base drawings, erosion protection, storm water permit, Anoka County Highway Department permits, application and construction plans for RCWD permit, final construction plans, bid documents and specifications.
 
3.      Construction Services.
Construction staking, observation of electrical and lighting work, observation of concession/utility building and consulting with City on as-needed basis during construction.    
 
All submitted proposals were reviewed by City staff and they met the above required components. Staff is recommending the City Council accept the proposal from Carlson-McCain based on their relevant experience with athletic complex designs, past experience with City of Blaine park projects and the lowest estimated cost for their planning services at $162,750.
 
If accepted, the project schedule calls for the consultant to have the preliminary construction plans to the City by January 15, 2013 and the final project plans completed by March 1, 2013.
 
 
Recommendation
By motion, accept the proposal for Park Planning Services for Lexington Athletic Complex from Carlson-McCain at the Estimated Cost of $162,750.