Title: GRANTING FINAL PLAT APPROVAL TO SUBDIVIDE 9.26 ACRES INTO 14 SINGLE FAMILY LOTS AND ONE (1) OUTLOT TO BE KNOWN AS WOODLAND VILLAGE 2ND ADDITION AT WOODLAND VILLAGE PARKWAY/HUPP STREET. WOODLAND DEVELOPMENT CORPORATION. (CASE FILE NO. 12-0015/SLK)
Sponsors: Bryan Schafer
Attachments: 1. Attachments.pdf
ITEM:         11.1         DEVELOPMENT BUSINESS - Bryan K. Schafer, Planning and Community Development Director
 
Title
GRANTING FINAL PLAT APPROVAL TO SUBDIVIDE 9.26 ACRES INTO 14 SINGLE FAMILY LOTS AND ONE (1) OUTLOT TO BE KNOWN AS WOODLAND VILLAGE 2ND ADDITION AT WOODLAND VILLAGE PARKWAY/HUPP STREET. WOODLAND DEVELOPMENT CORPORATION. (CASE FILE NO. 12-0015/SLK)
 
Schedule of Actions
Planning Commission (Public Hearing)
04/12/11
City Council (Pre Plat/CUP)
05/19/11
City Council (Pre Plat Extension)
10/20/11
City Council (Final Plat - 1st Addition)
04/05/12
City Council (Final Plat - 2nd Addition)
06/07/12
 
 
Background
 
The preliminary plat, Woodland Village was approved in May 2011.  The preliminary plat approval included approval for 85 dwelling units creating a mixture of single and twinhome residential units.  The applicant is requesting approval to final plat 14 single family lots that were a part of the preliminary plat that was approved in 2011.
 
The final plat proposal consists of subdividing approximately 9.26 acres into a subdivision with a total of 14 single family dwelling units. The final plat also includes an outlot for a wetland and drainage area.
 
The single-family product will be custom built homes.  The single-family lots for these homes are proposed to be typically 85 feet in width, with several being wider and a couple being under this width.  The typical depth is 150 feet, with most of the lots being much larger than this in depth. These homes will be enhanced with impressive exterior architectural details. The homes will include brick, stone, stucco, and varying gables and hip rooflines. The development standards, for construction of homes and development of the lots, were approved by the Conditional Use Permit issued in May of 2011.
 
The final plat is consistent with the approved preliminary plat, Resolution No. 11-45.
 
 
Recommendation
By motion, approve the Resolution.
 
Attachments
Zoning and Location Map
Final Plat
 
Body
PER SECTION 74-43 OF THE SUBDIVISION ORDINANCE
 
WHEREAS, an application has been filed by Woodland Development Corporation as subdivision Case No. 12-0015; and
 
WHEREAS, said case involves the division of land in Anoka County, Minnesota, described as follows:
 
LOTS 9, 10, 11 AND 12 BLOCK 3, AND OUTLOT J, GARDENWOOD, ANOKA COUNTY, MINNESOTA. TOGETHER WITH:
 
LOT 1, BLOCK 2, GARDENWOOD 2ND ADDITION, ANOKA COUNTY, MINNESOTA.
 
WHEREAS, the Blaine City Council granted preliminary plat approval on May 19, 2011, subject to the stipulations as contained in Blaine City Council Resolution No. 11-45; and
 
WHEREAS, the applicant has submitted a final plat in general conformance with the approved preliminary plat.
 
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Blaine that final plat approval for Woodland Village 2nd Addition per Section 74-43 of the subdivision regulations is hereby granted subject to the following conditions:
 
1.      The developer has responsibility for financial participation in Lexington Avenue NE improvements associated with this development.  This includes, but is not limited to, intersection improvements, traffic signal installations, and roadway widening improvements. It will be proposed to assess Lots in the plat for these improvements when they are installed in the future.
 
2.      Plans and specifications must be approved by the City prior to start of construction.
 
3.      Standard utility and drainage easements must be dedicated along all lot lines and over areas of delineated wetlands, wetland mitigation, infiltration trenches, drainage swales, and storm water management ponds.
 
4.      The Developer is to provide access for inspection and maintenance of storm water management infrastructure.  Restrictions will be placed on lot lines as needed to limit fences and landscaping to insure access
 
5.      Development requires a National Pollutant Discharge Elimination System (NPDES) Phase II General Storm Water Permit for Construction Activity from Minnesota Pollution Control Agency (MPCA).  A prerequisite to the MPCA permit application includes preparation of a site Storm Water Pollution Prevention Plan (SWPPP) for the development site.
 
6.      Construction contract documents shall include a mass (rough) grading, erosion protection, sediment control, development, utilities, and storm drainage plan sheets.
 
7.      The grading plan shall provide greater detail on protecting existing trees and providing additional information on adjacent property. The soil exchange within portions of the plat to be outlined in the revised grading plans. An as-built grading plan will be required to show the location, depth, and types of fill for all affected lots in the plat. Required storm water detention basins shall not be over sized for sand excavation, so that additional areas of trees can be saved.  Storm pipes shall not be routed through tree preservation areas.
 
8.      The development plan shall indicate all structures will be protected from flooding.
 
9.      A twenty foot buffer strip shall be considered adjacent to wetland edges and shall be placed in an easement.
 
10.      RCWD permit is required prior to City approval of construction plans and specifications.
 
11.      The Developer shall process a Letter of Map Amendment with FEMA and shall provide all FEMA paperwork and structure as-built surveys to homeowners at time of lot closing.  Developer is responsible for following through with FEMA as necessary to receive final FEMA documents and to provide those documents to the homeowners, and to record the final documents on the certificate of title for each parcel in the development.
 
12.      As-built surveys shall be required to verify structure elevations, custom grading requirements, and final lot grading elevations.
 
13.      Utilities (sanitary, water main, storm water management) maintenance shall be the responsibility of property owners according to current City ordinances.  Shared driveways are private and shall be maintained by a homeowners association.
 
14.      Park dedication to be paid for 14 housing units at the 2012 rate of $2,557 per unit.  The total park dedication fee is $35,798.
 
15.      Developer to require homeowner's associations to be responsible for maintenance and upkeep of landscape improvements along and within the right-of-way.
 
16.      Developer to install grouped mailboxes with design and locations approved by City and US Postal Service.
 
17.      Private shared driveways can be constructed to a minimum of 22 feet in width if signed "No Parking". Private 24-foot wide streets can be parked on one side provided "NO PARKING FIRE LANE" signs are posted per fire department guidelines.
 
18.      Developer shall explore water source for landscape irrigation systems installed throughout the development including the possible use of created ponds, existing wells, or new wells as source of water supply with a moisture sensor installed.
 
19.      Water and sanitary sewer availability charges (WAC & SAC) become due with each building permit at the rate established at the time the building permit is issued.
 
20.      All development signage by separate review.
 
21.      The City has a contract in place to construct sidewalk, trail and street improvements on Hupp Street and on Woodland Parkway.  Any damage done by home builders to these improvements will be the responsibility of the home builder to replace at the direction of the City Engineering Department.
 
22.      Lots 8-11, Block 1, and Lots 1-3, Block 2, will share private loop driveways and will not be allowed direct driveway access to Woodland Parkway.
 
23.      Execution and recording of a Development Agreement, which sets forth in greater detail the plat conditions as well as other responsibilities for the development of this plat.
 
PASSED by the City Council of the City of Blaine this 7th day of June 2012.