Blaine logo
File #: ORD 15-2307    Version: Name: 1st Rdg - Ord Amending Sec 33.16 of Zoning Ordinance
Type: Ordinance Status: Passed
File created: 2/19/2015 In control: City Council
On agenda: 3/19/2015 Final action: 3/19/2015
Title: SECOND READING AMENDING SECTION 33.16(i)(1)(d), SOIL EROSION AND SEDIMENTATION CONTROL, SWPPP DESIGN COMPONENTS, GENERAL CRITERIA, TRAINING, ZONING ORDINANCE OF THE CITY OF BLAINE
Sponsors: Jim Hafner
CONSENT AGENDA - Jim Hafner, Stormwater Manager
 
Title
SECOND READING
 
AMENDING SECTION 33.16(i)(1)(d), SOIL EROSION AND SEDIMENTATION CONTROL,  SWPPP DESIGN COMPONENTS, GENERAL CRITERIA, TRAINING, ZONING ORDINANCE OF THE CITY OF BLAINE
 
Background
As of August 1, 2013, the Minnesota Pollution Control Agency (MPCA) revised and reissued the Municipal Separate Storm Sewer System (MS4) permit.  In March 2014, the City of Blaine (the City) was extended coverage under the newly revised permit.  In order to remain compliant, the City is required to update its stormwater related ordinances, policies and Stormwater Pollution Prevention Plan (SWPPP).
 
The City's stormwater and erosion control ordinances need minor revisions to ensure compliance with the MS4 permit requirements.  These changes were explained to Council at the January 22nd Workshop.  They consist of adding detail and specifics to measures already included in the ordinance.  The result brings the ordinances into compliance but does not exceed what is necessary and does not raise the bar above the minimum requirements of the MS4 permit.  Costs of compliance, whether to the City on its own projects or to contractors working within the City, will be minimal and in most cases will not add any additional cost.
 
The stormwater ordinance revisions are being presented separately from those of the erosion control ordinance as the former is located in the City Code of Ordinances and the latter is contained in the Zoning Code.
 
Ordinance No. 15-2307 was introduced for first reading at the February 19, 2015 Council meeting and is now presented for final adoption.
 
Recommendation
By motion, adopt Ordinance No. 15-2307.
 
Body
THE CITY OF BLAINE DOES ORDAIN:   (Added portions are underscored and deleted portions are shown in brackets with overstrike.)
 
Section 33.16(i)(1)(d):
 
(d) Training - The applicant must identify a person knowledgeable and experienced in the application of erosion prevention and sediment control BMPs who will oversee the implementation of the SWPPP, and the installation, inspection and maintenance of the erosion prevention and sediment control BMPs before and during construction. Name of person(s) trained, proof of training, date and course name/provider must be on record and made available as part of the permit application.
 
INTRODUCED AND READ in full the 19th day of February, 2015.
 
PASSED by the City Council of the City of Blaine this 19th day of March, 2015.