Blaine logo
File #: RES 15-096    Version: 1 Name: 15-18 Aldi - Lexington Ave - Final Plat
Type: Resolution Status: Passed
File created: 5/21/2015 In control: City Council
On agenda: 5/21/2015 Final action: 5/21/2015
Title: GRANTING FINAL PLAT APPROVAL TO RE-PLAT TWO EXISTING LOTS (32.78 ACRES TOTAL) INTO TWO NEWLY RECONFIGURED LOTS, A 30.55 ACRE PARCEL AND A 2.23 ACRE PARCEL TO BE KNOWN AS MILLS SECOND ADDITION TO BLAINE AT 10220 LEXINGTON AVENUE NE. ALDI, INC. (CASE FILE NO. 15-0018)
Sponsors: Bryan Schafer
Attachments: 1. Aldi - Attachments 052115
DEVELOPMENT BUSINESS - Bryan K. Schafer, Planning and Community Development Director
 
Title
GRANTING FINAL PLAT APPROVAL TO RE-PLAT TWO  EXISTING LOTS (32.78 ACRES TOTAL) INTO TWO NEWLY RECONFIGURED LOTS, A 30.55 ACRE PARCEL AND A 2.23 ACRE PARCEL TO BE KNOWN AS MILLS SECOND ADDITION TO Blaine AT 10220 LEXINGTON AVENUE NE. ALDI, INC. (CASE FILE NO. 15-0018)
 
Schedule of Actions
Planning Commission (Public Hearing)
04/14/15
City Council (Preliminary Plat)
05/07/15
City Council (Final Plat)
05/21/15
 
Background
The applicant, Aldi, Inc. is proposing to re-plat Lots 1 and 3 Block 1 Mills Addition. The two existing parcels are approximately 33 acres combined.  The applicant is working with the property owner, in order to adjust the west and north property line.  The lot line adjustments will provide a useable lot for the grocery type use they are proposing.
 
The applicant proposes to use the property as an Aldi Food Market after the platting process is complete.  The proposed building will be 17,825 square feet.
 
Originally, Lot 3 was platted by the property owner with the intent to sell the parcel in the future.  The applicant and property owner now wish to re-plat Lot 1 and 3 Block 1 Mills Addition. The re-platting and additional area of Lot 2 Block 1 (2.23 acres) Mills Second Addition provides a more substantial and wider parcel to construct a grocery store.   Lot 1 Block 1 with the existing Mills Fleet Farm building and associated parking will be 30.55 acres.
 
Lot 2 of the proposed plat is served with sanitary sewer and water services.  A separate domestic water service is required from the fire line.  An 8" diameter water main is required for the site to serve an on-site fire hydrant and the building fire line.  Water availability charge (WAC) and sewer availability charge (SAC) become due with the building permit application.  
 
This application requires Rice Creek Watershed District (RCWD) review and permit prior to any work being performed on site.  The developer must have RCWD approval prior to the plat being released for recording with Anoka County.  
 
The developer will need to contact the Anoka County Highway Department to verify if a permit is required for work along Lexington Avenue.
 
The developer is required to apply for a National Pollutant Discharge Elimination System (NPDES) Phase II permit from the MN Pollution Control Agency.  A copy of the permit application and Storm Water Pollution Prevention Program must be sent to the City.  Site approval will not be granted and no work performed on site until receipt of this information.
 
Dedication of drainage and utility easements are required over storm water detention basin and on all lot lines.  
 
Park dedication was previously paid when the parcel was platted with Mills Addition in 2007.
 
The final plat is consistent with the approved preliminary plat, Resolution No. 15-084.
 
Recommendation
By motion, approve the Resolution.
 
Attachments
Zoning and Location Map
Final Plat
 
Body
      WHEREAS, an application has been filed by Aldi, Inc. as subdivision Case No. 15-0018; and
 
      WHEREAS, said case involves the division of land in Anoka County, Minnesota, described as follows:
 
LOTS 1 and 3 BLOCK 1 MILLS ADDITION TO BLAINE, SUBJ TO EASE OF REC CITY OF BLAINE, ANOKA COUNTY, MINNESOTA
 
      WHEREAS, the Blaine City Council granted preliminary plat approval on May 7, 2015, subject to the stipulations as contained in Blaine City Council Resolution No. 15-084; and
 
      WHEREAS, the applicant has submitted a final plat in general conformance with the approved preliminary plat.
 
      NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Blaine that final plat approval for Mills Second Addition per Section 74-43 of the subdivision regulations is hereby granted subject to the following conditions:
 
1.      The proposed plat requires site and grading plan approval.
2.      Rice Creek Watershed District (RCWD) approval is required prior to release of the plat for recording with Anoka County.  Developer must contact the Anoka County Highway Department for permit requirements.
3.      A separate domestic water service is required from the fire line.  An 8" diameter water service is required to the fire hydrant.
4.      Water availability charge (WAC) and sewer availability charge (SAC) become due with the building permit.
5.      Future maintenance of the storm water detention basins will be the responsibility of the developer.
6.      The developer is required to apply for a National Pollutant Discharge Elimination System (NPDES) Phase II permit from the MN Pollution Control Agency.  A copy of the permit application and Storm Water Pollution Prevention Program must be sent to the City.  Site approval will not be granted and no work performed on site until receipt of this information.
7.      Dedication of drainage and utility easements are required over the storm detention basin and on all lot lines.
8.      The Mayor, City Manager and City Clerk are hereby authorized to execute any and all necessary documents, agreements and releases related to the approval, recording, or administration of Mills Second Addition.
 
PASSED by the City Council of the City of Blaine this 21st day of May, 2015.