Title: GRANTING FINAL PLAT APPROVAL TO SUBDIVIDE 21.59 ACRES INTO LOTS 1 AND 1A AND TWO (2) OUTLOTS TO BE KNOWN AS CSM LEXINGTON FOURTH ADDITION, LOCATED AT 3640 PHEASANT RIDGE DRIVE NE. CSM EQUITIES, LLC. (CASE FILE NO. 16-0015/LSJ)
Sponsors: Bryan Schafer
Attachments: 1. Streamworks Final Plat - Attachments

DEVELOPMENT BUSINESS - Bryan K. Schafer, Planning and Community Development Director

 

Title

GRANTING FINAL PLAT APPROVAL TO SUBDIVIDE 21.59 ACRES INTO LOTS 1 AND 1A AND TWO (2) OUTLOTS TO BE KNOWN AS CSM LEXINGTON FOURTH ADDITION, LOCATED AT 3640 PHEASANT RIDGE DRIVE NE.  CSM EQUITIES, LLC.  (CASE FILE NO. 16-0015/LSJ)

 

Schedule of Actions

Planning Commission (Public Hearing)

04/12/16

City Council (Preliminary Plat)

04/21/16

City Council (Final Plat)

05/05/16

 

Background

The proposed final plat consists of one lot and two outlots.  A new building is proposed on Lot 1A and Lot 1B of the plat.  You are seeing a plat with lots labeled as “A” and “B” because it is partially Torrens property and it must be platted as such with Anoka County.  The two outlots could be replatted as lots and developed in the future. Lots 1A and 1B are 8.74 acres. 

Because the property was previously platted as outlots, park dedication has never been paid for the property.  Park dedication would be due for the platted lot, which is 8.74 acres, at the industrial rate in effect at the time of final plat approval. Payment would be required prior to release of final plat mylars for recording.  Outlots will be subject to park dedication fees at the time in which they are developed.  The current industrial rate for park dedication is $6,093 per acre for a total amount due of $53,253 in 2016. 

CSM, the developer, will extend Pheasant Ridge Drive and provide a cul-de-sac that will serve as an access for this lot and any future outlots.  The construction of this extension and cul-de-sac will be the responsibility of the developer.  

 

The final plat is consistent with the approved preliminary plat, Resolution No. 16-066.

 

Recommendation

By motion, approve the Resolution.

 

Attachments

Zoning and Location Map

Final Plat

 

Body

                     WHEREAS, an application has been filed by CSM Equities, LLC as subdivision Case No. 16-0015; and

 

                     WHEREAS, said case involves the division of land in Anoka County, Minnesota, described as follows:

 

Outlot B, CSM LEXINGTON THIRD ADDITION, Anoka County, Minnesota

 

AND

 

Outlot E, CSM LEXINGTON SECOND ADDITION, Anoka County, Minnesota; and

 

                     WHEREAS, the Blaine City Council granted preliminary plat approval on April 21, 2016, subject to the stipulations as contained in Blaine City Council Resolution No. 16-066; and

 

                     WHEREAS, the applicant has submitted a final plat in general conformance with the approved preliminary plat.

 

                     NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Blaine that final plat approval for development name per Section 74-43 of the subdivision regulations is hereby granted subject to the following conditions:

 

1.                     Park dedication would be due for the platted lot, which is 8.74 acres, at the industrial rate in effect at the time of final plat approval. Payment would be required prior to release of final plat mylars for recording.  Outlots will be subject to park dedication fees at the time in which they are developed.  The current industrial rate for park dedication is $6,093 per acre for a total amount due of $53,253 in 2016.

2.                     City Council approval of this development shall be contingent upon RCWD approval.  No site work will be allowed until a RCWD permit has been obtained. 

3.                     A National Pollutant Discharge Elimination System (NPDES) Phase II permit is required from the MN Pollution Control Agency.

4.                     All internal utilities shall be maintained privately by the development association, including storm sewer piping, infiltration basins, and storm water sediment ponds.

5.                     Water Availability Charges (WAC) and Sewer Availability Charges (SAC) become due with each building permit.

6.                     Dedication of utility and drainage easements along lot lines, over delineated wetlands and created wetlands and storm water sediment ponds.

7.                     Developer is responsible for constructing and financing the proposed extension of Pheasant Ridge Drive and associated cul-de-sac.

8.                     Developer to execute a Development Agreement that establishes the standards and requirements for constructing public improvements (Pheasant Ridge Drive).

9.                     Trunk sanitary sewer charges become due with platting on upland areas.  The 2016 rate is $3,798 per acre on 7.51 upland acres, for a total charge of $28,523.

10.                     The original EAW prepared for the CSM development anticipated that at some point traffic levels from the business park would require capacity improvements at the intersection of Pheasant Ridge Drive and Lexington Avenue.  The City will be evaluating this intersection in the next year as part of a 2017 project to resurface a portion of Pheasant Ridge Drive. This evaluation will not only determine what intersection changes or improvements are needed for better levels of service but how those costs will be financed and shared including possible assessments to business park property.

11.                      The Mayor, City Clerk and City Manager are hereby authorized to execute any and all necessary documents, agreements and releases related to the approval, recording or administration of CSM Lexington Fourth Addition plat.

 

PASSED by the City Council of the City of Blaine this 5th day of May, 2016.