Blaine logo
File #: RES 18-209    Version: 1 Name: Hy-Vee Final Plat
Type: Resolution Status: Passed
File created: 11/15/2018 In control: City Council
On agenda: 11/15/2018 Final action: 11/15/2018
Title: GRANTING FINAL PLAT APPROVAL TO SUBDIVIDE 39.24 ACRES INTO TWO LOTS AND THREE OUTLOTS TO BE KNOWN AS BLAINE HY-VEE, LOCATED AT 210 125TH AVENUE NE. (CASE FILE NO. PC18-0049/LSJ)
Sponsors: Bryan Schafer
Attachments: 1. Attachments-Final Plat

DEVELOPMENT BUSINESS - Bryan K. Schafer, Planning and Community Development Director

 

Title

GRANTING FINAL PLAT APPROVAL TO SUBDIVIDE 39.24 ACRES INTO TWO LOTS AND THREE OUTLOTS TO BE KNOWN AS BLAINE  HY-VEE, LOCATED AT 210 125TH AVENUE NE. (CASE FILE NO. PC18-0049/LSJ)

 

Schedule of Actions

Planning Commission (Public Hearing)

09/11/2018

City Council (Preliminary Plat)

10/04/2018

City Council (Preliminary Plat)

10/18/2018

City Council (Final Plat)

11/15/2018

 

Background

The City Council approved a rezoning, conditional use permit and a preliminary plat on October 18, 2018 for the development that includes a Hy-Vee store and convenience/gas store and car wash on the southwest corner of Jefferson Street NE and 125th Avenue. The final plat is being presented for approval at this time.

 

The final plat consists of two lots and three outlots. The gas/convenience store/car wash would be located on Lot 1 of the plat. Lot 1 is 4.27 acres. The parcel on which the Hy-Vee grocery store would be located would be platted as Lot 2. Lot 2 is 12.93 acres. Outlot A will be used for storm draining purposes. Outlots B and C will be used for future development.

 

Park dedication will need to be paid on the two lots being platted at this time. The 2018 park dedication rate for commercial property is $8,704 per acre. The total acreage for Lots 1 and 2 is 17.2 acres so the total fee would be $149,709. This fee must be paid prior to release of the final plat mylars by the City for recording purposes at Anoka County. Park dedication will also be required on the outlots when they are re-platted and developed in the future.

 

The development is proposing to realign the existing ditch. This will require review and permit from the Coon Creek Watershed District. The ditch realignment will require the new ditch alignment to be placed in a platted drainage and utility easement.

 

The existing 124th Lane in the Crescent Ponds addition will need to be properly abandoned and realigned, along with the walk extension into the proposed plat. The walk extension and connection will need to be incorporated into the first phase of site work. The development will also be responsible to complete a water main loop with the connection from the stubbed water main on Jefferson Street (north end of Crescent Ponds) to the intersection of 125th Lane and Jefferson.

 

Jefferson Street will be extended southward through the plat and connect through to 121st Avenue establishing the planned transportation link between University Avenue and 125th Avenue. This extension is identifies as a collector street on the city’s State Aid system and will need to be constructed to State Aid Standards. This street connection has been part of the City’s master plan for this area since the Crescent Ponds neighborhoods were initially conceived.

 

Recommendation

By motion, approve the Resolution.

 

Attachments

Zoning & Location Map

Final Plat

 

Body

                     WHEREAS, an application has been filed by Alliant Engineering, Inc., as subdivision Case No. PC18-0049; and

 

                     WHEREAS, said case involves the division of land in Anoka County, Minnesota, described as follows:

 

The Northeast Quarter of the Northwest Quarter of Section 7, Township 31, Range 23, Anoka County.

 

Except for the land described as follows:

The South 640.0 feet of the North 715.0 feet of the East 40.0 feet of the Northeast Quarter (NE ¼) of the Northwest Quarter (NW ¼) of Section 7, Township 31, Range 23 according to the map or plat thereof on file and of record in the office of the County Recorder in and for Anoka County, Minnesota. Together with the right of access, being the right of ingress to and egress from the Northeast Quarter of the Northwest Quarter of Section 7, Township 31, Ranger 23, Anoka County, Minnesota to State Trunk Highway No. 242 (Main Street), except between points distant 811 and 841 feet Westerly of the East line of said Quarter Quarter. The distances being measured along the Southerly right of way line of said highway  Anoka County MN.

 

                     WHEREAS, the Blaine City Council granted preliminary plat approval on October 18, 2018, subject to the stipulations as contained in Blaine City Council Resolution No. 18-195; and

 

                     WHEREAS, the applicant has submitted a final plat in general conformance with the approved preliminary plat.

 

                     NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Blaine that final plat approval for Blaine Hy Vee per Section 74-43 of the subdivision regulations is hereby granted subject to the following conditions:

 

1.                     Park dedication will need to be paid on the two lots being platted at this time. The 2018 park dedication rate for commercial property is $8,704 per acre. The total acreage for Lots 1 and 2 is 17.2 acres so the total fee would be $149,709. This fee must be paid prior to release of the final plat mylars by the City for recording purposes at Anoka County. Park dedication will be required on the outlots when they are re-platted and developed.

2.                     The plat to dedicate necessary right-of-way for extension and modifications of Jefferson Street.

3.                     Developer to construct the extension and modifications to Jefferson Street as directed and approved by the City. Jefferson Street will need to be constructed to State Aid standards and all of the Jefferson Street improvements are to be completed by the developer at their sole cost and prior to seeking a Certificate of Occupancy for any building space within the plat.

4.                     Developer to obtain permit from Coon Creek Watershed prior to any site work.

5.                     Developer to obtain permit from Anoka County Highway Department for any work within county right-of-way and approval of the proposed access from 125th Avenue.

6.                     The existing 124th Lane in the Crescent Ponds addition will need to be properly abandoned and realigned, along with the walk extension into the proposed plat.

7.                     The walk extension from 124th Lane and connection thru the site to Jefferson Street will need to be incorporated into the first phase of site work.

8.                     The development will also be responsible to complete a water main loop with the connection from the stubbed water main on Jefferson Street (north end of Crescent Ponds) to the intersection of 125th Lane and Jefferson.

9.                     A development agreement which outlines all of the developer responsibilities for Developer Installed Public Improvements will be required prior to any work being performed on site.

10.                     The Mayor, City Clerk and City Manager are hereby authorized to execute any and all necessary documents, agreements and releases related to the approval, recording or administration of the plat.

 

PASSED by the City Council of the City of Blaine this 15th day of November, 2018.