File #: RES 14-187    Version: 1 Name: Order Preparation of Proposed Assessment-Project 12-17
Type: Resolution Status: Passed
File created: 10/2/2014 In control: City Council
On agenda: 10/2/2014 Final action: 10/2/2014
Title: ORDER PREPARATION OF PROPOSED ASSESSMENT FOR PARTIAL RECONSTRUCTION OF PAUL PARKWAY FROM OAK PARK BOULEVARD TO ULYSSES STREET, IMPROVEMENT PROJECT NO. 12-17
Sponsors: Jean Keely
Attachments: 1. 12-17 Order&CallAsmtRoll.pdf, 2. 12-17 Assmt Map.pdf
Related files: RES 12-130, RES 13-008, RES 13-018, RES 14-210
ADMINISTRATION - Jean M. Keely, City Engineer
 
Title
ORDER PREPARATION OF PROPOSED ASSESSMENT FOR PARTIAL RECONSTRUCTION OF PAUL PARKWAY FROM OAK PARK BOULEVARD TO ULYSSES STREET,
IMPROVEMENT PROJECT NO. 12-17
 
 
Background
Project No. 12-17 includes spot concrete curb and gutter replacement, spot concrete sidewalk replacement, storm sewer structures, asphalt surface, traffic control signage, striping, and appurtenant construction.
The estimated total cost of the project is as follows:
 
Construction Costs………………….
$539,977.62
Engineering Costs…………………
$  80,494.26
Interest……………………………...
$    4,864.10
Administration, Assessing, Other…...
$  28,405.40
Total…………………………………
$653,741.38
 
The total project cost indicated in the Feasibility Report was $797,850.00.
 
The Assessment Roll has been prepared consistent with the Feasibility Report.  Of the total cost, the amount to be assessed is $211,463.33. The Public Utility Fund will contribute $2,906.00 for water and sewer improvements.  Municipal State Aid (MSA) contribution is $439,372.05.
 
Recommendation
By motion, approve the resolution.
 
Body
WHEREAS, a contract has been entered into for construction of spot concrete curb and gutter replacement, spot concrete sidewalk replacement, storm sewer structures, asphalt surface, traffic control signage, striping, and appurtenant construction in the following described area:
 
Paul Parkway from Oak Park Boulevard to Ulysses Street
 
AND WHEREAS, the estimated construction cost for such improvement is $539,977.62 and the expenses incurred in the making of said improvements amount to be $113,763.76 making the estimated total cost $653,741.38.
 
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Blaine as follows:
 
1.      The estimated total cost of such improvement is hereby declared to be $653,741.38.
 
2.      The amount to be assessed is hereby declared to be $211,463.33.  The Public Utility Fund will contribute $2,906.00.  Municipal State Aid (MSA) contribution is $439,372.05.
 
3.      The City Manager shall forthwith calculate the proper amount to be specially assessed for such improvement against every assessable lot, piece, or parcel of land within the district affected without regard to cash valuation, as provided by law, and he shall file a copy of such proposed assessment in his office for public inspection.
 
PASSED by the City Council of the City of Blaine this 2nd day of October 2014.