Blaine logo
File #: RES 14-185    Version: 2 Name: Order Preparation of Proposed Assessment-Proje11-11
Type: Resolution Status: Passed
File created: 10/2/2014 In control: City Council
On agenda: 10/2/2014 Final action: 10/2/2014
Title: ORDER PREPARATION OF PROPOSED ASSESSMENT FOR RECONSTRUCTION OF DAVENPORT STREET FROM 99TH LANE TO 105TH AVENUE, IMPROVEMENT PROJECT NO. 11-11
Sponsors: Jean Keely
Attachments: 1. 11-11 Order&Call.pdf, 2. assessment map.pdf
Related files: RES 13-011, RES 12-018, RES 12-010, RES 14-209
ADMINISTRATION - Jean M. Keely, City Engineer
 
Title
 
ORDER PREPARATION OF PROPOSED ASSESSMENT FOR RECONSTRUCTION OF DAVENPORT STREET FROM 99TH LANE TO 105TH AVENUE, IMPROVEMENT PROJECT NO. 11-11
 
Background
Project No. 11-11 includes partial reconstruction of the existing street section to include full concrete curb and gutter replacement, construction of three right turn lanes, spot concrete sidewalk replacement, new concrete sidewalk,  asphalt pavement replacement, storm drainage improvements, relocation of hydrants, traffic control signage, signal modification, striping, and related appurtenant construction.  The total cost of the project is as follows:
 
Construction Costs………………….
$   937,979.55
Engineering Costs…………………
$   128,408.60
Interest……………………………...
$       3,781.56
Administration, Assessing, Other…...
$     52,321.31
Total…………………………………
$1,122,491.02
 
The total project cost indicated in the Feasibility Report was $1,148,200.00.
 
The Assessment Roll has been prepared consistent with the Feasibility Report.  Of the total cost, the amount to be assessed is $456,306.64.  The Public Utility Fund will contribute $33,596.00 for water and sewer improvements.  Municipal State Aid (MSA) contribution is $632,588.38.
 
Recommendation
By motion, approve the resolution.
 
Body
WHEREAS, a contract has been entered into for partial reconstruction of the existing street section to include full concrete curb and gutter replacement, construction of three right turn lanes, spot concrete sidewalk replacement, new concrete sidewalk, asphalt pavement replacement, storm drainage improvements, relocation of hydrants, traffic control signage, signal modifications, striping, and related appurtenant construction in the following described area:
 
Davenport Street from 99th Lane to 105th Avenue (CR87)
 
AND WHEREAS, the construction cost for such improvement is $937,979.55 and the expenses incurred in the making of said improvements amount to be $184,511.47 making the total cost $1,122,491.02.
 
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Blaine as follows:
 
1.      The total cost of such improvement is hereby declared to be $1,122,491.02.
 
2.      The amount to be assessed is hereby declared to be $456,306.64.  The Public Utility Fund will contribute $33,596.00.  Municipal State Aid (MSA) contribution is $632,588.38.
 
3.      The City Manager shall forthwith calculate the proper amount to be specially assessed for such improvement against every assessable lot, piece, or parcel of land within the district affected without regard to cash valuation, as provided by law, and he shall file a copy of such proposed assessment in his office for public inspection.
 
PASSED by the City Council of the City of Blaine this 2nd day of October 2014.