Title: CALL FOR HEARING ON PROPOSED ASSESSMENT FOR RECONSTRUCTION OF DAVENPORT STREET FROM 99TH LANE TO 105TH AVENUE IMPROVEMENT PROJECT NO. 11-11
Sponsors: Jean Keely
Attachments: 1. 11-11 Order&Call.pdf, 2. assessment map.pdf
Related files: RES 13-011, RES 12-018, RES 12-010, RES 14-209
ADMINISTRATION - Jean M. Keely, City Engineer
 
Title
 
CALL FOR HEARING ON PROPOSED ASSESSMENT FOR
RECONSTRUCTION OF DAVENPORT STREET FROM 99TH LANE TO 105TH AVENUE
IMPROVEMENT PROJECT NO. 11-11
 
 
Background
Project No.11-11 includes partial reconstruction of the existing street section to include full concrete curb and gutter replacement, construction of three right turn lanes, spot concrete sidewalk replacement, new concrete sidewalk,  asphalt pavement replacement, storm drainage improvements, relocation of hydrants, traffic control signage, signal modifications, striping, and related appurtenant construction.  The total cost of the project is as follows:
 
Construction Costs………………….
$   937,979.55
Engineering Costs…………………
$   128,408.60
Interest……………………………...
$       3,781.56
Administration, Assessing, Other…...
$     52,321.31
Total…………………………………
$1,122,491.02
 
The total project cost indicated in the Feasibility Report was $1,148,200.00.
 
The Assessment Roll has been prepared consistent with the Feasibility Report.  Of the total cost, the amount to be assessed is $456,306.64.  The Public Utility Fund will contribute $33,596.00 for water and sewer improvements.  Municipal State Aid (MSA) contribution is $632,588.38.
 
Recommendation
By motion, approve the resolution.
 
Body
WHEREAS, pursuant to Resolution No. 14-185 passed by the Blaine City Council on October 2, 2014, the City Manager was directed to prepare a proposed assessment of the cost for partial reconstruction of the existing street section to include full concrete curb and gutter replacement, construction of three right turn lanes, spot concrete sidewalk replacement, new concrete sidewalk, asphalt pavement replacement, storm drainage improvements, relocation of hydrants, traffic control signage, signal modifications, striping, and related appurtenant construction in the following described area:
 
Davenport Street from 99th Lane to 105th Avenue (CR87)
 
AND WHEREAS, the City Manager has notified the City Council that such proposed assessment has been completed and filed in his office for public inspection.
 
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Blaine as follows:
 
1.      A hearing shall be held on the 6th day of November, 2014, in the Council Chambers at Blaine City Hall at 8:00 PM, or as near that time as possible, to pass upon such proposed assessment at such time and place all persons owning property affected by such improvement will be given an opportunity to be heard with reference to such assessment.
 
2.      The City Manager shall give published and mailed notice of such hearing as required by law.
 
PASSED by the City Council of the City of Blaine this 2nd day of October, 2014.