Skip to main content
Blaine logo
File #: RES 18-48    Version: 1 Name: 18-01 Springbrook 2nd - Final Plat
Type: Resolution Status: Passed
File created: 4/5/2018 In control: City Council
On agenda: 4/5/2018 Final action: 4/5/2018
Title: GRANTING FINAL PLAT APPROVAL TO SUBDIVIDE APPROXIMATELY 28.05 ACRES INTO 31 SINGLE FAMILY LOTS AND SIX (6) OUTLOTS TO BE KNOWN AS SPRINGBROOK 2ND ADDITION, LOCATED AT 129TH LANE/DUNKIRK STREET NE. SPRINGBROOK LAND, LLC. (CASE FILE NO. 18-0001/SLK)
Sponsors: Bryan Schafer
Attachments: 1. Springbrook 2nd Final Plat - Attachments.pdf

DEVELOPMENT BUSINESS - Bryan K. Schafer, Planning and Community Development Director

 

Title

GRANTING FINAL PLAT APPROVAL TO SUBDIVIDE APPROXIMATELY 28.05 ACRES INTO 31 SINGLE FAMILY LOTS AND SIX (6) OUTLOTS TO BE KNOWN AS SPRINGBROOK 2ND ADDITION, LOCATED AT 129TH LANE/DUNKIRK STREET NE.  SPRINGBROOK LAND, LLC.  (CASE FILE NO. 18-0001/SLK)

 

Schedule of Actions

Planning Commission (Public Hearing)

02/13/18

City Council (Preliminary Plat)

03/15/18

City Council (Final Plat)

04/05/18

 

Background

The final plat proposal consists of subdividing approximately 28 acres into a subdivision with a total of 30 new dwelling units and one lot for the existing home that will remain. This application proposes single-family homes for the new lots.

 

The proposed plat is located along the alignments of 129th Lane NE and Dunkirk Street NE. 

 

The existing detached accessory building located on proposed Outlot F will need to be removed prior to the final platting of Outlot F or no later than December 31, 2018, whichever comes first.  A financial guarantee of $5,000 will be required for removal of the accessory building.

 

Because of the extensive grading effort required over almost all of the 20 acres to meet the market demand for walk-out and look-out style homes there is significant tree removal. Tree replacement, based on 20 acres, would require planting 160 trees (8 trees per acre). This is best achieved by requiring as part of the DF zoning approval the planting of 3 trees per lot (90 trees in this plat). The remaining trees will be planted is later phases.  

 

Engineering Items

Developer installed improvements shall include construction of all streets within the plat including sanitary sewer and water main with services, storm drainage improvements, storm water management and water quality treatment infrastructure, streets with concrete curb and gutter, 6 foot concrete sidewalks along Flanders Court and  129th Lane NE, streetlights, mailboxes, traffic control signs, street signs, and all appurtenant items.  Plans and specifications must be approved by the City prior to start of construction.

 

Trunk sanitary sewer area charges become due with platting for upland acreage.  The 2018 rate for Sanitary Sewer District 6-5 is $6,229 per upland acre. 

 

The developer has responsibility for financial participation in the Plat’s share of the cost of off-site improvements required by Anoka County on 125th Avenue NE at Harpers Street.  This includes, but is not limited to, intersection improvements, traffic signal installations, and roadway widening improvements.   The City has calculated the development potential of all of the developable property, lying north of 125th Avenue and within the current development schedule provided by the 2005 MUSA and has determined the following: 

 

The developer has responsibility for financial participation in 125th Avenue NE improvements associated with this development.  This includes, but is not limited to, intersection improvements, traffic signal installations, and roadway widening improvements.  Anoka County will specify required improvements in their plat review.  The City has calculated the development potential of all of the developable property, lying north of 125th Avenue and within the current development schedule provided by the 2005 MUSA and has determined the per lot cost associated for the improvements.  The 2018 rate per lot is $1,573 per lot, with 30 new lots proposed the charge would be $47,190.    

 

All local public streets typically require dedication of 60 feet of right-of-way and shall be constructed to 29 feet back to back of width.  All streets will follow the Anoka County street name grid system. 

 

Street and utility extensions are required to the edges of the plat for future connections to the adjacent parcels.

 

Sidewalks (6-foot) will be constructed on one side of all streets with the exception of the short cul-de-sacs of Coral Sea Court and Dunkirk Circle.

 

Standard utility and drainage easements must be dedicated along all lot lines and over areas of wetlands, wetland mitigation, infiltration trenches, drainage swales, and storm water management ponds. The Developer is to provide access for inspection and maintenance of storm water management infrastructure.  Restrictions will be placed on lot lines as needed to limit fences and landscaping to insure access. Developer to verify normal ground water elevation in ponds.  If the “Normal Ground Water Elevation” does not match the “Normal Water Elevation” that the 10:1 safety bench is designed at, provide a dense vegetative buffer strip between the two elevations.  Developer shall submit a buffer strip seed mix design for review.  All pond slopes shall be 4:1 except below Normal Ground Water Elevation, which can be 3:1.

 

Each lot shall have a minimum rear yard area behind each structure of a minimum of 20 feet from the structure at a maximum grade of 5%.

 

Development requires a National Pollutant Discharge Elimination System (NPDES) Phase II Permit from Minnesota Pollution Control Agency (MPCA). 

 

Construction contract documents shall include a grading, erosion protection, sediment control, development, utilities, roadway, and storm drainage plans.  Plans shall detail tree preservation, erosion protection, sediment control, proposed grading contours, utilities, roadway geometrics, storm drainage, storm water quality management, custom lot-grading, structure type, and structure elevation information.  Additional information is required on adjacent parcels that indicate existing drainage patterns are being addressed.  The development plan shall indicate all structures will be protected from flooding.  Supporting geotechnical investigation report, soil boring logs and hydrology report shall be included in the submittal for City review and approval.

 

Coon Creek Watershed District (CCWD) will need to approve and permit this plat, prior to any site work.  The developer has applied to the watershed for permit and is in their process.

 

As-built surveys shall be required to verify structure elevations, custom grading requirements, and final lot grading elevations.

 

The applicant has proposed a preliminary plat that proposes a cul-de-sac in the northwest corner of the plat.  The applicant, watershed and City staff has determined that the impact of the ditch/wetland area to extend a street to the northwest corner of the plat providing access to the property to the north is not very feasible. 

 

A trail connection from Flanders Court to the cul-de-sac from the adjacent plat (Wagamon Ranch) will be required to provide pedestrian access between neighborhoods for better connectivity to Harpers Park.  The trail/boardwalk will be required to be constructed with the addition of the plat that constructs Flanders Court cul-de-sac and/or the cul-de-sac to the north. 

 

The existing home on Lot 1 Block 4 will continue to use the well and septic that is located on proposed Outlot F.  The existing house will be able to continue to use the existing septic until Flanders Street right of way and  preliminary plat Lot 30 is platted in the future.   The existing home will be required to connect to City water when the lots located on Dunkirk Circle are platted and Dunkirk Circle is constructed with utilities.

 

The final plat is consistent with the approved preliminary plat, Resolution No. 18-36.

 

Recommendation

By motion, approve the Resolution.

 

Attachments

Zoning and Location Map

Final Plat

 

Body

                     WHEREAS, an application has been filed by Springbrook Land, LLC as subdivision Case No.18-0001; and

 

                     WHEREAS, said case involves the division of land in Anoka County, Minnesota, described as follows:

 

Lot 1, Block 1, Harpers West, Anoka County, Minnesota

 

Together with:

 

OUTLOTS E, F and G, Springbrook, Anoka County, Minnesota

 

                     WHEREAS, the Blaine City Council granted preliminary plat approval on March 15, 2018, subject to the stipulations as contained in Blaine City Council Resolution No. 18-36; and

 

                     WHEREAS, the applicant has submitted a final plat in general conformance with the approved preliminary plat.

 

                     NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Blaine that final plat approval for Springbrook 2nd Addition per Section 74-43 of the subdivision regulations is hereby granted subject to the following conditions:

 

1.                     All streets will follow the Anoka County street name grid system.

2.                     The developer has responsibility for financial participation in 125th Avenue NE improvements associated with this development. This includes, but is not limited to, intersection improvements, traffic signal installations and roadway widening improvements. Anoka County will specify required improvements as part of their review. The City has calculated the development potential of all the developable property lying north of 125th Avenue and within the current development scheduled provided by the 2005 MUSA and has determined the per lot cost associated for the improvements.  The 2018 rate is $1,573 per lot, with 30 new lots proposed the charge would be $47,190.  Payment rate to be recalculated for plats approved in future years.

3.                     Development installed improvements shall include construction of all streets within the plat, also including sanitary sewer and water main, with services, storm drainage improvements, storm water management and water quality treatment infrastructure, streets with concrete curb and gutter, six foot concrete sidewalks along Flanders Court and 129th Lane NE, street lights, mailboxes, traffic control signals, street signs and all appurtenant items.

4.                     Plans and specifications must be approved by the City prior to start of construction.

5.                     Trunk sanitary sewer area charges become due with platting at the rate in effect at time of plat approval. The 2018 rate for Sanitary Sewer District 6-5 is $6,229 per upland acre. This plat will be charged the 2018 rate for the number of lots that are platted in 2018.  Area charges to be recalculated for payments in future years as plat phases are approved.

6.                     Street and utility extensions are required to the edges of the plat for future connections to adjacent parcels.

7.                     Sidewalks (6-foot) will be constructed on one side of all streets with the exception of the short cul-de-sacs of Coral Sea Court and Dunkirk Circle.

8.                     Standard utility and drainage easements must be dedicated along all lot lines and over areas of delineated wetlands, wetland mitigation, infiltration trenches, drainage swales and storm water management ponds.

9.                     Each lot shall have a minimum rear yard area behind each structure of a minimum of 20 feet from the structure at a maximum grade of 5%.

10.                     The Developer to provide access for inspection and maintenance of storm water management infrastructure. Restrictions will be placed on lot lines as needed to limit fences and landscaping to ensure access.

11.                     Development requires a National Pollutant Discharge Elimination System (NPDES) Permit from Minnesota Pollution Control Agency (MPCA).

12.                     Construction contract documents shall include a rough grading, erosion protection, sediment control, development, utilities, roadway and storm drainage plans. Supporting wetland delineation report, geotechnical investigation report, soil boring logs and hydrology report shall be included in the submittal for City review and approval.

13.                     The development plan shall indicate all structures will be protected from flooding.

14.                     CCWD permit is required prior to City approval for construction plans and specifications.

15.                     As-built surveys shall be required to verify structure elevations, custom grading requirements and final lot grading elevations.

16.                     Developer to install grouped mailboxes with design and locations approved by the City and US Postal Services.

17.                     Water and sanitary sewer availability charges (WAC & SAC) become due with each building permit at the rate established at the time the building permit is issued.

18.                     All development signage by separate review.

19.                     Park dedication is required for this plat at the rate in effect at the time of each final plat.  The 2018 rate is $4,320 per lot, for a total park dedication requirement, based on 30 new lots, of $129,600.  This payment must be made prior to release of final plat mylars for recording at Anoka County. 

20.                     All wells and septic systems to be properly abandoned per all local and state requirements.

21.                     The existing detached accessory building located on proposed Outlot F will need to be removed prior to the final platting of Outlot F or no later than December 31, 2018, whichever comes first.  A financial guarantee of $5,000 will be required for removal of the accessory building.

22.                     The existing home on Lot 1 Block 4 will continue to use the well and septic that is located on proposed Outlot F.  The existing house will be able to continue to use the existing septic until Flanders Street right of way and  preliminary plat Lot 30 is platted in the future.   The existing home will be required to connect to City water when the lots located on Dunkirk Circle are platted and Dunkirk Circle is constructed with utilities.  A $20,000 escrow is required to cover sewer installation in the event that the septic system fails and is required prior to the plat being released for recording.  A letter from Springbrook Land, LLC and Mohs acknowledging the septic field is outside Lot 1 Block 4. The letter should also state estimated time of removal.

23.                     A trail connection from Flanders Court to cul-de-sac to the adjacent plat of Wagamon Ranch will be required to provide pedestrian connectivity between plats.  This trail connection will be required to be placed at a location approved by the City and will be required to be constructed with the addition of the plat that constructs Flanders Court cul-de-sac and/or the cul-de-sac to the north. The City acknowledges that the cost of this connection is between  $90,000-$110,000 and agrees to utilize up to 10 lots of park dedication credit from future plat phase (value of $43,200 if constructed in 2018) to support the construction of this pedestrian connection.

24.                     Execution and recording of a Development Agreement which sets forth in greater detail the plat conditions as well as other responsibilities for the development of this plat.

25.                     The Mayor, City Clerk and City Manager are hereby authorized to execute any and all necessary documents, agreements and releases related to the approval, recording or administration of Springbrook 2nd Addition.

 

PASSED by the City Council of the City of Blaine this 5th day of April, 2018.