File #: RES 14-218    Version: 1 Name: 14-65 Woodland Village 9th - FInal Plat
Type: Resolution Status: Passed
File created: 11/20/2014 In control: City Council
On agenda: 11/20/2014 Final action: 11/20/2014
Title: GRANTING FINAL PLAT APPROVAL TO SUBDIVIDE 10 ACRES INTO 25 SINGLE FAMILY LOTS TO BE KNOWN AS WOODLAND VILLAGE 9th ADDITION. (CASE FILE NO. 14-0065/SLK)
Sponsors: Bryan Schafer
Attachments: 1. Woodland Village 9th - Location Map, 2. Woodland Village 9th - Final Plat
DEVELOPMENT BUSINESS- Bryan K. Schafer, Planning and Community Development Director
 
Title
GRANTING FINAL PLAT APPROVAL TO SUBDIVIDE 10 ACRES INTO 25 SINGLE FAMILY LOTS TO BE KNOWN AS WOODLAND VILLAGE 9th ADDITION. (CASE FILE NO. 14-0065/SLK)
 
Schedule of Actions
Planning Commission (Public Hearing)
07/12/05
City Council (Pre Plat/CUP)
04/06/06
City Council (Final Plat 9th Addition/CUP Amendment)
11/20/14
 
Background
The preliminary plat, Gardenwood Addition was approved in April 2006. The preliminary plat approval included approval for 118 single family lots.   The applicant is requesting approval to final plat 25 lots that were a part of the original preliminary plat that was approved in 2006.
 
The single-family product will be custom built homes.  The single-family lots for these homes are proposed to be typically 85 feet in width, with several being wider and a couple being under this width.  The typical depth is 150 feet, with most of the lots being much larger than this in depth. These homes will be enhanced with impressive exterior architectural details. The homes will include brick, stone, stucco, and varying gables and hip rooflines.
 
The final plat is consistent with the approved preliminary plat, Resolution No. 06-91.
 
Recommendation
By motion, approve the Resolution.
 
Attachments
Zoning and Location Map
Final Plat
 
Body
WHEREAS, an application has been filed by Woodland Development Corporation as subdivision Case No. 14-0065; and
 
WHEREAS, said case involves the division of land in Anoka County, Minnesota, described as follows:
 
OUTLOT A, WOODLAND VILLAGE 5th ADDITION, ANOKA COUNTY, MINNESOTA.
 
WHEREAS, the Blaine City Council granted preliminary plat approval on November 20, 2014, subject to the stipulations as contained in Blaine City Council Resolution No. 06-91; and
 
WHEREAS, the applicant has submitted a final plat in general conformance with the approved preliminary plat.
 
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Blaine that final plat approval for Woodland Village 9th Addition per Section 74-43 of the subdivision regulations is hereby granted subject to the following conditions:
 
1.      The developer may have responsibility for financial participation in Lexington Avenue NE improvements associated with this development.  This includes, but is not limited to, intersection improvements, traffic signal installations, and roadway widening improvements.  It may be proposed to assess Lots in the plat for these improvements.
2.      All local public streets require dedication of 60 feet of right-of-way and shall be constructed to 29 feet back to back of width.
3.      All streets will follow the Anoka County street name grid system.  The street in the plat shall be Lever Street NE.  The existing portion of Lever Court NE adjacent to Lots 12-13, platted with Sunset Ponds 2nd Addition shall be renamed to Lever Street NE to facilitate public safety access.  The City will work with the existing property owners and the Post Office to assist with the name change.
4.      Plans and specifications must be approved by the City prior to start of construction.
5.      Street and utility extensions are required to the edge of the plat for future connection to the adjacent parcels.  Sanitary sewer and water services shall be installed to serve current homes and potential lots on the east side of existing Lever Court NE in the plat of Sunset Pond 2nd Addition.  The City will reimburse the Developer the cost to install these services at the City's typical rates from the City's Assessment Policy.  When the services are used, the City will collect these charges back with the connection permit.  This reimbursement for service installation was used with the Gardenwood plat for the existing lots on the south side of 117th Avenue, east of Lexington Avenue.  Details of the reimbursement amounts will be set forth in the Development Contract.
6.      Standard utility and drainage easements must be dedicated along all lot lines and over areas of delineated wetlands, wetland mitigation, infiltration trenches, drainage swales, and storm water management ponds.
7.      The Developer is to provide access for inspection and maintenance of storm water management infrastructure.  Restrictions will be placed on lot lines as needed to limit fences and landscaping to insure access.
8.      Development requires a National Pollutant Discharge Elimination System (NPDES) Phase II General Storm Water Permit for Construction Activity from Minnesota Pollution Control Agency (MPCA).  A prerequisite to the MPCA permit application includes preparation of a site Storm Water Pollution Prevention Plan (SWPPP) for the development site.
9.      Construction contract documents shall include a mass (rough) grading, erosion protection, sediment control, development, utilities, roadway, and storm drainage plan sheets.  Supporting wetland delineation report, geotechnical investigation report, soil boring logs, and hydrology report shall be included in the submittal for City review and approval.
10.      The grading plan shall provide greater detail on protecting existing trees and providing additional information on adjacent property.  An as-built grading plan will be required to show the location, depth, and types of fill for all affected lots in the plat. Required storm water detention basins shall not be over sized for sand excavation, so that additional areas of trees can be saved.  Storm pipes shall not be routed through tree preservation areas.
11.      The existing cul-de-sac on Lever Court NE shall be served with public sanitary sewer and water improvements.  The cul-de-sac "bubble" shall be removed to lower public maintenance costs.  Existing driveways and bouelvards shall be reconstructed to connect to the new street.
12.      The development plan shall indicate all structures will be protected from flooding.  
13.      A twenty foot buffer strip shall be considered adjacent to wetland edges and shall be placed in an easement.
14.      RCWD permit is required prior to City approval of construction plans and specifications.
15.      The Developer shall process a Letter of Map Amendment with FEMA and shall provide all FEMA paperwork and structure as-built surveys to homeowners at time of lot closing.  Developer is responsible for following through with FEMA as necessary to receive final FEMA documents and to provide those documents to the homeowners, and to record the final documents on the certificate of title for each parcel in the development.
16.      As-built surveys shall be required to verify structure elevations, custom grading requirements, and final lot grading elevations.
17.      Park dedication to be paid for 25 housing units at the 2014 rate of $3,094 per unit.  The total park dedication fee is $77,350.
18.      Developer to install grouped mailboxes with design and locations approved by City and US Postal Service.
19.      Developer shall explore water source for landscape irrigation systems installed throughout the development including the possible use of created ponds, existing wells, or new wells as source of water supply with a moisture sensor installed.
20.      Water and sanitary sewer availability charges (WAC & SAC) become due with each building permit at the rate established at the time the building permit is issued.
21.      All development signage by separate review.
22.      Execution and recording of a Development Agreement, which sets forth in greater detail the plat conditions as well as other responsibilities for the development of this plat.
23.      The Mayor, City Clerk and City Manager are hereby authorized to execute any and all necessary documents, agreements and releases related to the approval, recording or administration of Woodland Village 9th Addition.
 
PASSED by the City Council of the City of Blaine this 20th day of November 2014.